BR100 Increased By (1.02%)
BR30 Increased By (1.71%)
KSE100 Increased By (0.58%)
KSE30 Increased By (0.65%)
BECO 6.03 Increased By ▲ 0.26 (4.51%)
BML 52.61 Decreased By ▼ -0.39 (-0.74%)
BOP 34.23 Increased By ▲ 0.24 (0.71%)
CNERGY 8.16 Increased By ▲ 0.05 (0.62%)
DCL 12.23 Increased By ▲ 0.03 (0.25%)
FCCL 53.80 Increased By ▲ 0.97 (1.84%)
FCSC 5.24 Increased By ▲ 0.17 (3.35%)
FFL 18.03 Increased By ▲ 0.08 (0.45%)
FNEL 1.30 Increased By ▲ 0.01 (0.78%)
HUMNL 11.00 Increased By ▲ 0.12 (1.1%)
KEL 8.07 Increased By ▲ 0.05 (0.62%)
KOSM 5.39 Decreased By ▼ -0.13 (-2.36%)
MLCF 87.90 Increased By ▲ 1.39 (1.61%)
NBP 186.60 Increased By ▲ 1.44 (0.78%)
PACE 10.75 Increased By ▲ 0.17 (1.61%)
PAEL 39.95 Increased By ▲ 0.53 (1.34%)
PIAHCLA 26.19 Decreased By ▼ -0.03 (-0.11%)
PIBTL 17.32 Increased By ▲ 0.65 (3.9%)
PPL 233.49 Increased By ▲ 5.31 (2.33%)
PRL 34.98 Increased By ▲ 0.30 (0.87%)
PTC 67.71 Increased By ▲ 2.38 (3.64%)
SEARL 90.90 Increased By ▲ 0.77 (0.85%)
SSGC 27.20 Increased By ▲ 0.60 (2.26%)
TELE 8.57 Increased By ▲ 0.29 (3.5%)
THCCL 60.85 Increased By ▲ 2.35 (4.02%)
TPLP 8.78 Increased By ▲ 0.56 (6.81%)
TREET 24.65 Increased By ▲ 0.12 (0.49%)
TRG 71.50 Increased By ▲ 1.79 (2.57%)
WAVES 10.01 Increased By ▲ 0.07 (0.7%)
WTL 1.27 Decreased By ▼ -0.01 (-0.78%)
By

MULTAN: Managing Director WASA Chaudhry Muhammad Danish issued high alert in WASA after heavy rain in the city here on Saturday afternoon.

Managing Director WASA directed sewerage, disposal station officials to remain alert. He paid visit to various parts of the city along with director works Arif Abbas to check the drainage arrangements and inspected working of disposal stations.

Various disposal stations were run through generators due to electricity load shedding. Disposal station division ordered to keep standby generators operational and to mobilize teams and machinery into the field.

MD WASA directed to ensure drainage of rain water from metro routes and low lying areas. He directed to run all disposal stations at full capacity and ensure complete drainage of rainwater in the field. He ordered to remain into field till complete drainage of rain water and to follow SOPs for drainage of rain water from pond area.

Director works presented report to MD WASA as 69 millimeter rain was recorded at Chungi No 9 disposal station, 51 mm at old Shujabad road and 63 mm at Kari Jamandan disposal station.

MD WASA set up camp office at Chungi No 9 disposal station for monitoring of rain water. He directed officials to remain alert due to prediction of more rain.

Comments

Comments are closed for this article.