BR100 Increased By (1.02%)
BR30 Increased By (1.71%)
KSE100 Increased By (0.58%)
KSE30 Increased By (0.65%)
BECO 6.03 Increased By ▲ 0.26 (4.51%)
BML 52.61 Decreased By ▼ -0.39 (-0.74%)
BOP 34.23 Increased By ▲ 0.24 (0.71%)
CNERGY 8.16 Increased By ▲ 0.05 (0.62%)
DCL 12.23 Increased By ▲ 0.03 (0.25%)
FCCL 53.80 Increased By ▲ 0.97 (1.84%)
FCSC 5.24 Increased By ▲ 0.17 (3.35%)
FFL 18.03 Increased By ▲ 0.08 (0.45%)
FNEL 1.30 Increased By ▲ 0.01 (0.78%)
HUMNL 11.00 Increased By ▲ 0.12 (1.1%)
KEL 8.07 Increased By ▲ 0.05 (0.62%)
KOSM 5.39 Decreased By ▼ -0.13 (-2.36%)
MLCF 87.90 Increased By ▲ 1.39 (1.61%)
NBP 186.60 Increased By ▲ 1.44 (0.78%)
PACE 10.75 Increased By ▲ 0.17 (1.61%)
PAEL 39.95 Increased By ▲ 0.53 (1.34%)
PIAHCLA 26.19 Decreased By ▼ -0.03 (-0.11%)
PIBTL 17.32 Increased By ▲ 0.65 (3.9%)
PPL 233.49 Increased By ▲ 5.31 (2.33%)
PRL 34.98 Increased By ▲ 0.30 (0.87%)
PTC 67.71 Increased By ▲ 2.38 (3.64%)
SEARL 90.90 Increased By ▲ 0.77 (0.85%)
SSGC 27.20 Increased By ▲ 0.60 (2.26%)
TELE 8.57 Increased By ▲ 0.29 (3.5%)
THCCL 60.85 Increased By ▲ 2.35 (4.02%)
TPLP 8.78 Increased By ▲ 0.56 (6.81%)
TREET 24.65 Increased By ▲ 0.12 (0.49%)
TRG 71.50 Increased By ▲ 1.79 (2.57%)
WAVES 10.01 Increased By ▲ 0.07 (0.7%)
WTL 1.27 Decreased By ▼ -0.01 (-0.78%)

KARACHI: OGDCL has issued an ‘Annual Turnaround Plan 2023’ for its Kunnar-Pasakhi Deep (KPD) gas field whereby it will be undergoing planned maintenance for 16 days in three phases, i.e. from August 12 - 27, 2023.

According to the schedule, one full ATA of 8 days leading to a complete gas shutdown of the field, and two partial ATAs of 4 days each, have been planned by OGDCL. As a result, SSGC will face an estimated shortfall of 107mmcfd during the full ATA period and 50mmcfd each during the two partial ATAs.

Since the demand-supply gap of natural gas is already affected due to the constant depletion of gas reserves, this ATA will further widen this gap as due to this planned maintenance job, many customers and especially those located at the tail-end of SSGC's gas distribution lines may face low gas supplies and pressure.

SSGC will be closely monitoring the situation and will do its utmost to effectively manage the gas load by ensuring maximum available supplies to all categories of its customers. Moreover during these three phases of the ATA, SSGC would keep its customers in Sindh and Balochistan informed on the developments from the supply side.

Copyright Business Recorder, 2023

Comments

Comments are closed for this article.