BR100 Increased By (0.36%)
BR30 Decreased By (-0.13%)
KSE100 Increased By (0.22%)
KSE30 Increased By (0.37%)
AGHA 6.68 Increased By ▲ 0.01 (0.15%)
BECO 4.37 No Change ▼ 0.00 (0%)
BML 57.32 Increased By ▲ 0.88 (1.56%)
BOP 30.35 Increased By ▲ 0.01 (0.03%)
CNERGY 13.12 Increased By ▲ 0.03 (0.23%)
CSIL 5.41 Increased By ▲ 0.05 (0.93%)
FCCL 52.79 Increased By ▲ 0.41 (0.78%)
FFL 14.72 Decreased By ▼ -0.02 (-0.14%)
FNEL 1.12 No Change ▼ 0.00 (0%)
KEL 6.09 No Change ▼ 0.00 (0%)
KOSM 5.73 Increased By ▲ 0.77 (15.52%)
LOTCHEM 26.46 Decreased By ▼ -0.89 (-3.25%)
MLCF 93.16 Increased By ▲ 0.41 (0.44%)
NBP 164.66 Decreased By ▼ -0.32 (-0.19%)
NCPL 55.66 Increased By ▲ 0.02 (0.04%)
NPL 61.16 Decreased By ▼ -0.10 (-0.16%)
OGDC 316.73 Decreased By ▼ -1.03 (-0.32%)
PACE 9.87 Decreased By ▼ -0.06 (-0.6%)
PAEL 35.63 Increased By ▲ 0.13 (0.37%)
PIBTL 14.68 Increased By ▲ 0.11 (0.75%)
PPL 226.91 Decreased By ▼ -0.88 (-0.39%)
PRL 93.02 Increased By ▲ 0.45 (0.49%)
PTC 60.26 Decreased By ▼ -0.37 (-0.61%)
SSGC 23.81 Increased By ▲ 0.01 (0.04%)
TBL 8.75 Increased By ▲ 0.07 (0.81%)
TELE 7.80 Increased By ▲ 0.02 (0.26%)
TPL 22.35 Increased By ▲ 0.12 (0.54%)
TPLP 12.97 Increased By ▲ 0.30 (2.37%)
TREET 22.16 Decreased By ▼ -0.38 (-1.69%)
TRG 56.56 Decreased By ▼ -1.24 (-2.15%)

LAHORE: Bestway Cement Limited, Pakistan’s largest cement producer achieved yet another milestone. The company commenced production and despatches of cement at its greenfield plant in District Mianwali.

The plant is Bestway’s 8th production line with an annual production capacity of 2.3 million tonnes of cement. The state-of–the-art and most environmentally friendly plant has its own Waste Heat Recovery Power Plant of 9 MWs and 20 MWs of Solar Power generation thereby meeting more than half of its energy requirement through green and renewable means.

Bestway being the leader in water conservation was the first in the country to employ the Air Cooled Condenser (ACC) Systems, and the Mianwali plant too has its own ACC system. This, along with rain-harvesting, should enable the plant to eliminate its reliance on ground water for industrial use.

A simple ceremony was held at the plant premises to celebrate the occasion which was attended by the Chairman, Bestway Group, Sir Mohammed Anwar Pervez OBE HPk, the Group’s CEO, Lord Zameer M. Choudrey CBE SI Pk, the Group’s Director Finance, the Honourable Haider Choudrey, Managing Director Bestway Group Pakistan, Irfan Sheikh, the Company’s senior officials and delegates from the plant suppliers, Sinoma.

Copyright Business Recorder, 2023

Comments

Comments are closed for this article.