AIRLINK 80.60 Increased By ▲ 1.19 (1.5%)
BOP 5.26 Decreased By ▼ -0.07 (-1.31%)
CNERGY 4.52 Increased By ▲ 0.14 (3.2%)
DFML 34.50 Increased By ▲ 1.31 (3.95%)
DGKC 78.90 Increased By ▲ 2.03 (2.64%)
FCCL 20.85 Increased By ▲ 0.32 (1.56%)
FFBL 33.78 Increased By ▲ 2.38 (7.58%)
FFL 9.70 Decreased By ▼ -0.15 (-1.52%)
GGL 10.11 Decreased By ▼ -0.14 (-1.37%)
HBL 117.85 Decreased By ▼ -0.08 (-0.07%)
HUBC 137.80 Increased By ▲ 3.70 (2.76%)
HUMNL 7.05 Increased By ▲ 0.05 (0.71%)
KEL 4.59 Decreased By ▼ -0.08 (-1.71%)
KOSM 4.56 Decreased By ▼ -0.18 (-3.8%)
MLCF 37.80 Increased By ▲ 0.36 (0.96%)
OGDC 137.20 Increased By ▲ 0.50 (0.37%)
PAEL 22.80 Decreased By ▼ -0.35 (-1.51%)
PIAA 26.57 Increased By ▲ 0.02 (0.08%)
PIBTL 6.76 Decreased By ▼ -0.24 (-3.43%)
PPL 114.30 Increased By ▲ 0.55 (0.48%)
PRL 27.33 Decreased By ▼ -0.19 (-0.69%)
PTC 14.59 Decreased By ▼ -0.16 (-1.08%)
SEARL 57.00 Decreased By ▼ -0.20 (-0.35%)
SNGP 66.75 Decreased By ▼ -0.75 (-1.11%)
SSGC 11.00 Decreased By ▼ -0.09 (-0.81%)
TELE 9.11 Decreased By ▼ -0.12 (-1.3%)
TPLP 11.46 Decreased By ▼ -0.10 (-0.87%)
TRG 70.23 Decreased By ▼ -1.87 (-2.59%)
UNITY 25.20 Increased By ▲ 0.38 (1.53%)
WTL 1.33 Decreased By ▼ -0.07 (-5%)
BR100 7,629 Increased By 103 (1.37%)
BR30 24,842 Increased By 192.5 (0.78%)
KSE100 72,739 Increased By 767.9 (1.07%)
KSE30 24,033 Increased By 284.2 (1.2%)

KARACHI: Chairman Pakistan Railways Habib-ur-Rehman Gillani said that the 55 kilometer-long, dual-track freight corridor from the Karachi Port Trust to the Marshalling Yard Pipri would drastically curtail traffic congestion in the city.

“The project’s estimated cost is Rs70 billion and will be completed within two years from the day of inception of its civil work,” said the chairman Railways while addressing the conference of stakeholders and transaction advisory services held at DS office Karachi on Wednesday that was attended by representatives of various government organizations also.

“Besides alleviating the traffic woes of Karachiites, the freight corridor project will redress multiple environmental concerns also,” stated the chairman Railways and added that the freight corridor project would be built on the basis of public-private partnership, and the share of both sectors would be determined soon.

The Chairman further informed that Pakistan Railways had been enhancing its line capacity and increasing its rolling stock to meet the growing needs of its passenger and freight traffic and services.

The Chairman Railways also presided over a meeting of KCR consortium of consultants and was briefed about the developments that would lead to resumption of KCR service on remaining 16 kilometer loop line from Orangi to Drigh Road.

In another meeting the officials from Nespak consultancy firm met with the chairman and gave him a detailed presentation pertaining to the construction of railways theme park at Main Korangi Road.

Copyright Business Recorder, 2021

Comments

Comments are closed.