BR100 Increased By (0.01%)
BR30 Increased By (0.53%)
KSE100 Increased By (0.28%)
KSE30 Increased By (0.29%)
AGHA 6.38 Increased By ▲ 0.06 (0.95%)
BECO 4.35 Increased By ▲ 0.08 (1.87%)
BML 62.55 Increased By ▲ 0.10 (0.16%)
BOP 31.39 Increased By ▲ 0.16 (0.51%)
CNERGY 11.73 Increased By ▲ 0.14 (1.21%)
CSIL 5.91 Increased By ▲ 0.19 (3.32%)
FCCL 61.71 Increased By ▲ 0.17 (0.28%)
FFL 14.79 Decreased By ▼ -0.23 (-1.53%)
FNEL 1.24 Increased By ▲ 0.01 (0.81%)
KEL 6.32 Increased By ▲ 0.06 (0.96%)
KOSM 5.90 Increased By ▲ 0.34 (6.12%)
LOTCHEM 24.69 Increased By ▲ 0.01 (0.04%)
MLCF 103.93 Decreased By ▼ -0.15 (-0.14%)
NBP 173.32 Decreased By ▼ -1.96 (-1.12%)
NCPL 51.83 Decreased By ▼ -0.94 (-1.78%)
NPL 54.03 Decreased By ▼ -0.09 (-0.17%)
OGDC 315.87 Increased By ▲ 2.48 (0.79%)
PACE 9.26 Increased By ▲ 0.06 (0.65%)
PAEL 35.58 Decreased By ▼ -0.22 (-0.61%)
PIBTL 13.66 Increased By ▲ 0.19 (1.41%)
PPL 226.07 Increased By ▲ 4.26 (1.92%)
PRL 80.28 Increased By ▲ 1.20 (1.52%)
PTC 46.64 Decreased By ▼ -0.21 (-0.45%)
SSGC 23.82 Decreased By ▼ -0.05 (-0.21%)
TBL 9.24 Decreased By ▼ -0.07 (-0.75%)
TELE 7.55 Increased By ▲ 0.16 (2.17%)
TPL 24.54 Decreased By ▼ -0.57 (-2.27%)
TPLP 12.99 Increased By ▲ 0.48 (3.84%)
TREET 25.98 Decreased By ▼ -0.27 (-1.03%)
TRG 53.33 Decreased By ▼ -0.11 (-0.21%)
Pakistan

Mohmand & Bhasha – Pakistan to get two big water dams after five decades: PM

  • A video shared by Prime Minister Khan on twitter showed the under-construction site with diversion tunnels, outlet portals, access tunnel and re-regulation pond.
Published Updated
By

ISLAMABAD: Prime Minister Imran Khan on Tuesday said five decades after Mangla and Tarbela, Pakistan was going to have another two big water dams – Mohmand and Bhasha.

A video shared by Prime Minister Khan on twitter showed the under-construction site with diversion tunnels, outlet portals, access tunnel and re-regulation pond.

Being built on Swat River, the Mohmand Dam will generate 800 MW of hydroelectricity, irrigate over 16,000 acres of land and contribute heavily to the socio-economic uplift of the region.

Prime Minister Imran Khan had performed the ground-breaking of Mohmand Dam on May 2, 2019.

Besides hydropower generation, Mohmand Dam will help mitigate floods and ensure socio-economic uplift of the people of area. The site will be lined with around 1,000 trees to maintain the balance of environment.

Other sideline projects include, installation of solar panels at high schools and mosques and development of community infrastructure.

The Diamer Bhasha is being built on Indus River near Chilas in Khyber Pukhtunkhwa and Gilgit Baltistan, 315 km from Tarbela Dam and about 40 km downstream of Chilas.

Prime Minister Imran Khan had kicked off the mega construction work at Diamer-Bhasha Dam on July 15 this year.

The dam will produce 4,500 inexpensive and green hydel power.

The 272-metre high, having capacity of 6.4 million acre feet water reservoir, will be the country’s third big dam after Tarbela and Mangla dams.

Comments

Comments are closed for this article.