BR100 Increased By (0.01%)
BR30 Increased By (0.53%)
KSE100 Increased By (0.28%)
KSE30 Increased By (0.29%)
AGHA 6.38 Increased By ▲ 0.06 (0.95%)
BECO 4.35 Increased By ▲ 0.08 (1.87%)
BML 62.55 Increased By ▲ 0.10 (0.16%)
BOP 31.39 Increased By ▲ 0.16 (0.51%)
CNERGY 11.73 Increased By ▲ 0.14 (1.21%)
CSIL 5.91 Increased By ▲ 0.19 (3.32%)
FCCL 61.71 Increased By ▲ 0.17 (0.28%)
FFL 14.79 Decreased By ▼ -0.23 (-1.53%)
FNEL 1.24 Increased By ▲ 0.01 (0.81%)
KEL 6.32 Increased By ▲ 0.06 (0.96%)
KOSM 5.90 Increased By ▲ 0.34 (6.12%)
LOTCHEM 24.69 Increased By ▲ 0.01 (0.04%)
MLCF 103.93 Decreased By ▼ -0.15 (-0.14%)
NBP 173.32 Decreased By ▼ -1.96 (-1.12%)
NCPL 51.83 Decreased By ▼ -0.94 (-1.78%)
NPL 54.03 Decreased By ▼ -0.09 (-0.17%)
OGDC 315.87 Increased By ▲ 2.48 (0.79%)
PACE 9.26 Increased By ▲ 0.06 (0.65%)
PAEL 35.58 Decreased By ▼ -0.22 (-0.61%)
PIBTL 13.66 Increased By ▲ 0.19 (1.41%)
PPL 226.07 Increased By ▲ 4.26 (1.92%)
PRL 80.28 Increased By ▲ 1.20 (1.52%)
PTC 46.64 Decreased By ▼ -0.21 (-0.45%)
SSGC 23.82 Decreased By ▼ -0.05 (-0.21%)
TBL 9.24 Decreased By ▼ -0.07 (-0.75%)
TELE 7.55 Increased By ▲ 0.16 (2.17%)
TPL 24.54 Decreased By ▼ -0.57 (-2.27%)
TPLP 12.99 Increased By ▲ 0.48 (3.84%)
TREET 25.98 Decreased By ▼ -0.27 (-1.03%)
TRG 53.33 Decreased By ▼ -0.11 (-0.21%)
Pakistan

Usman Dar reviews pace of work on development projects

  • The SAPM reviewed the pace and quality of work on the ongoing projects and issued instructions to the concerned authorities in this regard.
Published Updated
By

SIALKOT: Special Assistant to the Prime Minister (SAPM) on Youth Affairs Usman Dar, along with Deputy Commissioner Sialkot Zeeshan Javed Lashari, reviewed the pace of construction work on Shahabpura flyover, Sial flyover, Sublime Chowk to Sambrial Interchange (Sialkot Lahore Motorway) road expansion and sewerage projects.

Pakistan Tehreek-e-Insaf (PTI) leader Amir Dar, Assistant Commissioner Sialkot Sulman Akbar, Engineer Khawar Anwar Khwaja, CO Tehsil Council Ansar Sahi, Haji Shahid Hussain, XEN Highway and XEN M&R were also present.

The SAPM reviewed the pace and quality of work on the ongoing projects and issued instructions to the concerned authorities in this regard.

He directed the local authorities of the construction companies to ensure timely completion of the ongoing projects.

Comments

Comments are closed for this article.