BR100 Increased By (0%)
BR30 Decreased By (-0.24%)
KSE100 Increased By (0.06%)
KSE30 Increased By (0.05%)
AGHA 6.70 Increased By ▲ 0.02 (0.3%)
BECO 4.37 No Change ▼ 0.00 (0%)
BML 56.95 Decreased By ▼ -0.37 (-0.65%)
BOP 30.35 No Change ▼ 0.00 (0%)
CNERGY 13.07 Decreased By ▼ -0.05 (-0.38%)
CSIL 5.37 Decreased By ▼ -0.04 (-0.74%)
FCCL 52.76 Decreased By ▼ -0.03 (-0.06%)
FFL 14.69 Decreased By ▼ -0.03 (-0.2%)
FNEL 1.13 Increased By ▲ 0.01 (0.89%)
KEL 6.17 Increased By ▲ 0.08 (1.31%)
KOSM 6.12 Increased By ▲ 0.39 (6.81%)
LOTCHEM 26.52 Increased By ▲ 0.06 (0.23%)
MLCF 93.21 Increased By ▲ 0.05 (0.05%)
NBP 165.10 Increased By ▲ 0.44 (0.27%)
NCPL 55.67 Increased By ▲ 0.01 (0.02%)
NPL 60.86 Decreased By ▼ -0.30 (-0.49%)
OGDC 315.50 Decreased By ▼ -1.23 (-0.39%)
PACE 9.95 Increased By ▲ 0.08 (0.81%)
PAEL 35.60 Decreased By ▼ -0.03 (-0.08%)
PIBTL 14.80 Increased By ▲ 0.12 (0.82%)
PPL 224.45 Decreased By ▼ -2.46 (-1.08%)
PRL 92.84 Decreased By ▼ -0.18 (-0.19%)
PTC 60.35 Increased By ▲ 0.09 (0.15%)
SSGC 23.85 Increased By ▲ 0.04 (0.17%)
TBL 8.76 Increased By ▲ 0.01 (0.11%)
TELE 7.80 No Change ▼ 0.00 (0%)
TPL 22.44 Increased By ▲ 0.09 (0.4%)
TPLP 12.87 Decreased By ▼ -0.10 (-0.77%)
TREET 22.18 Increased By ▲ 0.02 (0.09%)
TRG 56.52 Decreased By ▼ -0.04 (-0.07%)
Pakistan

Usman Dar reviews pace of work on development projects

  • The SAPM reviewed the pace and quality of work on the ongoing projects and issued instructions to the concerned authorities in this regard.
Published Updated
By

SIALKOT: Special Assistant to the Prime Minister (SAPM) on Youth Affairs Usman Dar, along with Deputy Commissioner Sialkot Zeeshan Javed Lashari, reviewed the pace of construction work on Shahabpura flyover, Sial flyover, Sublime Chowk to Sambrial Interchange (Sialkot Lahore Motorway) road expansion and sewerage projects.

Pakistan Tehreek-e-Insaf (PTI) leader Amir Dar, Assistant Commissioner Sialkot Sulman Akbar, Engineer Khawar Anwar Khwaja, CO Tehsil Council Ansar Sahi, Haji Shahid Hussain, XEN Highway and XEN M&R were also present.

The SAPM reviewed the pace and quality of work on the ongoing projects and issued instructions to the concerned authorities in this regard.

He directed the local authorities of the construction companies to ensure timely completion of the ongoing projects.

Comments

Comments are closed for this article.