AIRLINK 74.56 Increased By ▲ 0.31 (0.42%)
BOP 5.04 Decreased By ▼ -0.01 (-0.2%)
CNERGY 4.51 Increased By ▲ 0.09 (2.04%)
DFML 37.77 Increased By ▲ 1.93 (5.39%)
DGKC 90.97 Increased By ▲ 2.97 (3.38%)
FCCL 22.60 Increased By ▲ 0.40 (1.8%)
FFBL 32.66 Decreased By ▼ -0.06 (-0.18%)
FFL 9.75 Decreased By ▼ -0.04 (-0.41%)
GGL 10.98 Increased By ▲ 0.18 (1.67%)
HBL 115.90 No Change ▼ 0.00 (0%)
HUBC 136.25 Increased By ▲ 0.41 (0.3%)
HUMNL 10.15 Increased By ▲ 0.31 (3.15%)
KEL 4.62 Increased By ▲ 0.01 (0.22%)
KOSM 5.06 Increased By ▲ 0.40 (8.58%)
MLCF 40.41 Increased By ▲ 0.53 (1.33%)
OGDC 138.00 Increased By ▲ 0.10 (0.07%)
PAEL 27.62 Increased By ▲ 1.19 (4.5%)
PIAA 24.49 Decreased By ▼ -1.79 (-6.81%)
PIBTL 6.74 Decreased By ▼ -0.02 (-0.3%)
PPL 123.10 Increased By ▲ 0.20 (0.16%)
PRL 27.02 Increased By ▲ 0.33 (1.24%)
PTC 14.05 Increased By ▲ 0.05 (0.36%)
SEARL 58.86 Increased By ▲ 0.16 (0.27%)
SNGP 70.19 Decreased By ▼ -0.21 (-0.3%)
SSGC 10.37 Increased By ▲ 0.01 (0.1%)
TELE 8.58 Increased By ▲ 0.02 (0.23%)
TPLP 11.20 Decreased By ▼ -0.18 (-1.58%)
TRG 64.62 Increased By ▲ 0.39 (0.61%)
UNITY 26.55 Increased By ▲ 0.50 (1.92%)
WTL 1.40 Increased By ▲ 0.02 (1.45%)
BR100 7,858 Increased By 19.6 (0.25%)
BR30 25,581 Increased By 121.1 (0.48%)
KSE100 75,195 Increased By 264.2 (0.35%)
KSE30 24,177 Increased By 31.4 (0.13%)

imageNEW YORK: Boeing Co opened a $1 billion factory in Washington state on Friday that will make carbon-composite wings for its newest jetliner, the 777X, a key step toward delivering the first aircraft by 2020.

The building, adjacent to Boeing's wide-body aircraft plant in Everett, Washington, covers 27 acres (11 hectares) putting under one roof the equivalent of 25 football fields, Boeing said.

It will house three large autoclaves, or pressurized ovens, for curing the jet's carbon-composite wings, which replace the conventional aluminum construction process used for the current 777.

The autoclaves are 120 feet (37 metres) long and 28 feet (9 metres) in diameter and weigh more than 1 million pounds (453,600 kg) each, large enough to hold two 737 fuselages, Boeing said.

Boeing broke ground for the plant in August 2014, saying at the time it expected to occupy the plant this year. As many as 1,700 contractors were employed on the project at its peak, Boeing said.

The company did not say how many people will work at the plant.

Copyright Reuters, 2016

Comments

Comments are closed.