BR100 Increased By (2.8%)
BR30 Increased By (3.57%)
KSE100 Increased By (2.38%)
KSE30 Increased By (2.44%)
AGHA 6.12 Increased By ▲ 0.09 (1.49%)
BECO 4.16 Increased By ▲ 0.30 (7.77%)
BML 62.73 Increased By ▲ 1.73 (2.84%)
BOP 30.90 Increased By ▲ 2.81 (10%)
CNERGY 11.97 Increased By ▲ 0.23 (1.96%)
CSIL 5.42 Increased By ▲ 0.12 (2.26%)
FCCL 56.78 Increased By ▲ 2.32 (4.26%)
FFL 13.34 Increased By ▲ 0.27 (2.07%)
FNEL 1.15 Increased By ▲ 0.04 (3.6%)
KEL 6.00 Increased By ▲ 0.37 (6.57%)
KOSM 5.48 Increased By ▲ 0.14 (2.62%)
LOTCHEM 24.37 Increased By ▲ 0.54 (2.27%)
MLCF 97.49 Increased By ▲ 4.51 (4.85%)
NBP 174.50 Increased By ▲ 11.30 (6.92%)
NCPL 48.47 Increased By ▲ 0.20 (0.41%)
NPL 50.23 Increased By ▲ 0.52 (1.05%)
OGDC 310.47 Increased By ▲ 6.84 (2.25%)
PACE 9.05 Increased By ▲ 0.08 (0.89%)
PAEL 33.07 Increased By ▲ 1.16 (3.64%)
PIBTL 13.15 Increased By ▲ 0.41 (3.22%)
PPL 217.17 Increased By ▲ 4.26 (2%)
PRL 85.66 Increased By ▲ 1.32 (1.57%)
PTC 46.19 Increased By ▲ 1.20 (2.67%)
SSGC 23.32 Increased By ▲ 0.49 (2.15%)
TBL 9.02 Increased By ▲ 0.14 (1.58%)
TELE 6.73 Increased By ▲ 0.23 (3.54%)
TPL 26.10 Increased By ▲ 1.84 (7.58%)
TPLP 12.67 Increased By ▲ 0.68 (5.67%)
TREET 23.80 Increased By ▲ 0.66 (2.85%)
TRG 53.17 Increased By ▲ 1.70 (3.3%)

Anglo American Plc said on Thursday copper production rose in the first quarter, while output from Minas-Rio iron ore mine in Brazil soared as it ramped it up after resuming operations late last year.

Copper output climbed 4 percent to 161,100 tonnes for the three months ended March 31, the diversified miner with an over century-old history said. Minas-Rio iron ore production jumped 61 percent.

A renewed demand for copper, a metal that has a major role to play in automobiles and related industries, partly aided Anglo American in outperforming its major peers last year.

But the blue-chip miner said total output slipped by 6 percent during the quarter, partly hurt by production issues at Venetia diamond mine, Kumba Iron Ore and platinum group metals business unit.

The fall in total output was cushioned by stronger operational performance from copper, said Chief Executive Officer Mark Cutifani.

He added that the ramp-up at Minas-Rio iron ore mine in Brazil was ahead of plan following its resumption in December after months of closure.

Anglo American said in December it had received regulatory approval to step up production and cut costs at the mine. It then also hiked production target for 2019.

On Thursday, the company stood by that guidance.

"By the end of the quarter we had increased our production run-rate, are on track to deliver this year's production targets and our guidance is unchanged," Cutifani said in a statement.

Its smaller peer Antofagasta posted a 22.6 percent jump in first-quarter copper production this week, bolstered by better quality ore.

Shares of the FTSE 100 constituent, which have jumped nearly 20 percent this year, were expected to open 1 percent higher.

Copyright Reuters, 2019

Comments

Comments are closed for this article.