BR100 Increased By (0.11%)
BR30 Decreased By (-0.26%)
KSE100 Increased By (0.12%)
KSE30 Increased By (0.09%)
AGHA 7.79 Increased By ▲ 0.04 (0.52%)
BECO 5.23 Increased By ▲ 0.04 (0.77%)
BML 57.26 Decreased By ▼ -1.40 (-2.39%)
BOP 34.10 Increased By ▲ 0.41 (1.22%)
CNERGY 9.92 Decreased By ▼ -0.69 (-6.5%)
CSIL 5.35 Increased By ▲ 0.05 (0.94%)
FCCL 54.61 Increased By ▲ 0.87 (1.62%)
FFL 16.70 Increased By ▲ 0.24 (1.46%)
FNEL 1.24 Increased By ▲ 0.02 (1.64%)
KEL 7.42 Increased By ▲ 0.14 (1.92%)
KOSM 5.75 Increased By ▲ 0.11 (1.95%)
LOTCHEM 29.35 Decreased By ▼ -0.30 (-1.01%)
MLCF 94.35 Decreased By ▼ -2.01 (-2.09%)
NBP 202.70 Decreased By ▼ -0.83 (-0.41%)
NCPL 57.00 Increased By ▲ 0.15 (0.26%)
NPL 67.78 Increased By ▲ 0.47 (0.7%)
OGDC 316.40 Decreased By ▼ -1.82 (-0.57%)
PACE 10.64 Increased By ▲ 0.01 (0.09%)
PAEL 43.15 Increased By ▲ 1.38 (3.3%)
PIBTL 16.72 Decreased By ▼ -0.09 (-0.54%)
PPL 220.50 Increased By ▲ 0.33 (0.15%)
PRL 49.05 No Change ▼ 0.00 (0%)
PTC 70.98 Increased By ▲ 0.97 (1.39%)
SSGC 28.17 Decreased By ▼ -0.97 (-3.33%)
TBL 9.90 Increased By ▲ 0.13 (1.33%)
TELE 8.80 Decreased By ▼ -0.02 (-0.23%)
TPL 18.14 Increased By ▲ 0.97 (5.65%)
TPLP 13.40 Increased By ▲ 0.89 (7.11%)
TREET 22.75 Increased By ▲ 0.16 (0.71%)
TRG 60.30 Increased By ▲ 0.08 (0.13%)

LAHORE: Punjab Housing Minister Bilal Yasin has said that, for the first time in the province’s history, a significant budget has been allocated for drainage and clean water supply initiatives.

“Under the direction of the Punjab Chief Minister, multi-billion-rupee underground drainage projects have been launched as part of a long-term planning framework,” he stated while chairing a meeting to review the progress of ongoing development projects under the Punjab Development Plan. The managing directors of WASA from various districts participated in the meeting via video link, along with the Additional Secretary (Technical), the WASA Punjab Director General, the Deputy Secretary for Housing, and the WASA Additional Director General.

During the meeting, the minister instructed officials to expedite work to ensure effective drainage arrangements are in place before the upcoming monsoon season. He also emphasised that consultants from the public health engineering department should compile reports regarding the quality of work and compliance with standard operating procedures (SOPs) in various districts.

Moreover, the Additional Secretary (Technical) and the WASA Punjab Director General provided the Minister with updates on development work in different districts. They reviewed the monitoring mechanisms and timelines for projects in the initial phase districts in detail. A comprehensive briefing was given on the construction and rehabilitation of existing sewer lines, installation of new sewer lines, construction of storage tanks, and road restoration efforts.

The meeting revealed that 114 dewatering sets, 44 sucker machines, 40 sewer jetting machines, 56 tractor trolleys, 59 winch machines, 43 sewer desilting units, 22 dumpers, 26 wheel excavators, and 25 water browsers will be procured to strengthen drainage operations. Work has already begun at priority sites identified for immediate attention, categorised into three defined segments.

Copyright Business Recorder, 2026

Comments

200 characters remaining