BR100 Increased By (0.01%)
BR30 Increased By (0.53%)
KSE100 Increased By (0.28%)
KSE30 Increased By (0.29%)
AGHA 6.38 Increased By ▲ 0.06 (0.95%)
BECO 4.35 Increased By ▲ 0.08 (1.87%)
BML 62.55 Increased By ▲ 0.10 (0.16%)
BOP 31.39 Increased By ▲ 0.16 (0.51%)
CNERGY 11.73 Increased By ▲ 0.14 (1.21%)
CSIL 5.91 Increased By ▲ 0.19 (3.32%)
FCCL 61.71 Increased By ▲ 0.17 (0.28%)
FFL 14.79 Decreased By ▼ -0.23 (-1.53%)
FNEL 1.24 Increased By ▲ 0.01 (0.81%)
KEL 6.32 Increased By ▲ 0.06 (0.96%)
KOSM 5.90 Increased By ▲ 0.34 (6.12%)
LOTCHEM 24.69 Increased By ▲ 0.01 (0.04%)
MLCF 103.93 Decreased By ▼ -0.15 (-0.14%)
NBP 173.32 Decreased By ▼ -1.96 (-1.12%)
NCPL 51.83 Decreased By ▼ -0.94 (-1.78%)
NPL 54.03 Decreased By ▼ -0.09 (-0.17%)
OGDC 315.87 Increased By ▲ 2.48 (0.79%)
PACE 9.26 Increased By ▲ 0.06 (0.65%)
PAEL 35.58 Decreased By ▼ -0.22 (-0.61%)
PIBTL 13.66 Increased By ▲ 0.19 (1.41%)
PPL 226.07 Increased By ▲ 4.26 (1.92%)
PRL 80.28 Increased By ▲ 1.20 (1.52%)
PTC 46.64 Decreased By ▼ -0.21 (-0.45%)
SSGC 23.82 Decreased By ▼ -0.05 (-0.21%)
TBL 9.24 Decreased By ▼ -0.07 (-0.75%)
TELE 7.55 Increased By ▲ 0.16 (2.17%)
TPL 24.54 Decreased By ▼ -0.57 (-2.27%)
TPLP 12.99 Increased By ▲ 0.48 (3.84%)
TREET 25.98 Decreased By ▼ -0.27 (-1.03%)
TRG 53.33 Decreased By ▼ -0.11 (-0.21%)

ISLAMABAD: Power Division has issued a report on progress in power restoration in flood-affected areas. According to the report released by the Power Division, in the Peshawar Electric Supply Company (PESCO) region, 12 grids and 91 feeders were affected in Swat, Buner, Shangla, Swabi, and D I Khan, according to the Power Division report.

Out of these, 79 feeders have been fully restored and 12 partially restored, says the Power Division report.

In Gujranwala Electric Power Company (GEPCO)-managed areas — Sialkot, Narowal, Wazirabad, and Hafizabad — 10 grids and 86 feeders were affected. GEPCO has fully restored 62 feeders and partially restored 19, the report states.

In LESCO’s region, 46 affected feeders in Lahore, Kasur, and Okara have been partially restored. Full restoration is expected between August 31 and September 1, 2025.

In Faisalabad Electric Supply Company’s (FESCO) managed areas — Chiniot, Jhang, Sargodha, Mianwali, and D I Khan — 15 grids and 43 affected feeders have been temporarily restored.

In Multan Electric Power Company’s (MEPCO) service areas, 11 grids and 63 feeders were affected. The report added that as soon as floodwaters recede in MEPCO's region, restoration of the affected feeders will begin immediately.

In TESCO’s region, two affected feeders in North Waziristan have been temporarily restored, with full restoration expected by September 5, according to the Power Division.

Power Division maintained that field teams of Discos are working day and night on restoration efforts and assures that power supply in the affected areas will be fully restored as soon as possible.

Copyright Business Recorder, 2025

Comments

Comments are closed for this article.