BR100 Increased By (1.02%)
BR30 Increased By (1.71%)
KSE100 Increased By (0.58%)
KSE30 Increased By (0.65%)
BECO 6.03 Increased By ▲ 0.26 (4.51%)
BML 52.61 Decreased By ▼ -0.39 (-0.74%)
BOP 34.23 Increased By ▲ 0.24 (0.71%)
CNERGY 8.16 Increased By ▲ 0.05 (0.62%)
DCL 12.23 Increased By ▲ 0.03 (0.25%)
FCCL 53.80 Increased By ▲ 0.97 (1.84%)
FCSC 5.24 Increased By ▲ 0.17 (3.35%)
FFL 18.03 Increased By ▲ 0.08 (0.45%)
FNEL 1.30 Increased By ▲ 0.01 (0.78%)
HUMNL 11.00 Increased By ▲ 0.12 (1.1%)
KEL 8.07 Increased By ▲ 0.05 (0.62%)
KOSM 5.39 Decreased By ▼ -0.13 (-2.36%)
MLCF 87.90 Increased By ▲ 1.39 (1.61%)
NBP 186.60 Increased By ▲ 1.44 (0.78%)
PACE 10.75 Increased By ▲ 0.17 (1.61%)
PAEL 39.95 Increased By ▲ 0.53 (1.34%)
PIAHCLA 26.19 Decreased By ▼ -0.03 (-0.11%)
PIBTL 17.32 Increased By ▲ 0.65 (3.9%)
PPL 233.49 Increased By ▲ 5.31 (2.33%)
PRL 34.98 Increased By ▲ 0.30 (0.87%)
PTC 67.71 Increased By ▲ 2.38 (3.64%)
SEARL 90.90 Increased By ▲ 0.77 (0.85%)
SSGC 27.20 Increased By ▲ 0.60 (2.26%)
TELE 8.57 Increased By ▲ 0.29 (3.5%)
THCCL 60.85 Increased By ▲ 2.35 (4.02%)
TPLP 8.78 Increased By ▲ 0.56 (6.81%)
TREET 24.65 Increased By ▲ 0.12 (0.49%)
TRG 71.50 Increased By ▲ 1.79 (2.57%)
WAVES 10.01 Increased By ▲ 0.07 (0.7%)
WTL 1.27 Decreased By ▼ -0.01 (-0.78%)

ISLAMABAD: Power Division has issued a report on progress in power restoration in flood-affected areas. According to the report released by the Power Division, in the Peshawar Electric Supply Company (PESCO) region, 12 grids and 91 feeders were affected in Swat, Buner, Shangla, Swabi, and D I Khan, according to the Power Division report.

Out of these, 79 feeders have been fully restored and 12 partially restored, says the Power Division report.

In Gujranwala Electric Power Company (GEPCO)-managed areas — Sialkot, Narowal, Wazirabad, and Hafizabad — 10 grids and 86 feeders were affected. GEPCO has fully restored 62 feeders and partially restored 19, the report states.

In LESCO’s region, 46 affected feeders in Lahore, Kasur, and Okara have been partially restored. Full restoration is expected between August 31 and September 1, 2025.

In Faisalabad Electric Supply Company’s (FESCO) managed areas — Chiniot, Jhang, Sargodha, Mianwali, and D I Khan — 15 grids and 43 affected feeders have been temporarily restored.

In Multan Electric Power Company’s (MEPCO) service areas, 11 grids and 63 feeders were affected. The report added that as soon as floodwaters recede in MEPCO's region, restoration of the affected feeders will begin immediately.

In TESCO’s region, two affected feeders in North Waziristan have been temporarily restored, with full restoration expected by September 5, according to the Power Division.

Power Division maintained that field teams of Discos are working day and night on restoration efforts and assures that power supply in the affected areas will be fully restored as soon as possible.

Copyright Business Recorder, 2025

Comments

Comments are closed for this article.