BR100 Increased By (2.94%)
BR30 Increased By (3.47%)
KSE100 Increased By (2.69%)
KSE30 Increased By (2.84%)
BECO 5.62 Increased By ▲ 0.04 (0.72%)
BML 59.51 Decreased By ▼ -1.71 (-2.79%)
BOP 34.61 Increased By ▲ 0.93 (2.76%)
CNERGY 8.08 No Change ▼ 0.00 (0%)
DCL 12.05 Increased By ▲ 0.41 (3.52%)
FCCL 54.40 Increased By ▲ 2.26 (4.33%)
FCSC 5.52 Decreased By ▼ -0.11 (-1.95%)
FFL 18.05 Increased By ▲ 0.04 (0.22%)
FNEL 1.33 Decreased By ▼ -0.02 (-1.48%)
HUMNL 11.07 Increased By ▲ 0.03 (0.27%)
KEL 8.05 Increased By ▲ 0.21 (2.68%)
KOSM 5.88 Increased By ▲ 0.15 (2.62%)
MLCF 90.52 Increased By ▲ 4.01 (4.64%)
NBP 190.17 Increased By ▲ 5.87 (3.19%)
PACE 11.53 Decreased By ▼ -0.12 (-1.03%)
PAEL 41.07 Increased By ▲ 1.11 (2.78%)
PIAHCLA 25.84 Increased By ▲ 0.17 (0.66%)
PIBTL 17.51 Increased By ▲ 0.24 (1.39%)
PPL 225.84 Increased By ▲ 3.17 (1.42%)
PRL 34.63 Increased By ▲ 0.17 (0.49%)
PTC 64.62 Increased By ▲ 0.88 (1.38%)
SEARL 91.38 Increased By ▲ 0.92 (1.02%)
SSGC 26.97 Increased By ▲ 0.30 (1.12%)
TELE 8.93 Increased By ▲ 0.02 (0.22%)
THCCL 69.16 Increased By ▲ 0.69 (1.01%)
TPLP 10.90 Decreased By ▼ -0.30 (-2.68%)
TREET 24.64 Decreased By ▼ -0.06 (-0.24%)
TRG 69.78 Decreased By ▼ -0.81 (-1.15%)
WAVES 11.16 Increased By ▲ 0.05 (0.45%)
WTL 1.27 No Change ▼ 0.00 (0%)
By

KARACHI: A massive fire broke out in a wooden warehouse at the Timber Market in the Old Haji Camp area on Monday.

According to officials, the fire erupted in a wooden door warehouse spread across three shops in the Napier locality.

As flames quickly spread, four rickshaws and three motorcycles parked behind the warehouse were also engulfed in the blaze. Upon receiving information, four fire tenders were initially dispatched to the scene.

However, due to the intensity of the fire, a Karachi Metropolitan Corporation (KMC) bowser and two additional fire tenders were called in to assist in the operation.

Rescue teams, police, and Rangers also reached the spot, while assistance was sought from the Water Corporation. The fire was brought under control after a strenuous two-and-a-half-hour operation involving six fire brigade vehicles. The cooling process continued for over two hours to prevent any resurgence of flames.

A spokesperson for the Water Corporation stated that Managing Director (MD) Water Corporation imposed an emergency at the Nipa Plant Hydrant, ensuring a steady supply of water tankers to aid the firefighting efforts. Despite the intensity of the fire, no casualties were reported.

Comments

Comments are closed for this article.