BR100 Decreased By (-0.08%)
BR30 Increased By (0.08%)
KSE100 Decreased By (-0.11%)
KSE30 Decreased By (-0.2%)
AGHA 7.53 Decreased By ▼ -0.10 (-1.31%)
BECO 5.11 Decreased By ▼ -0.46 (-8.26%)
BML 58.30 Decreased By ▼ -1.44 (-2.41%)
BOP 34.58 Increased By ▲ 0.18 (0.52%)
CNERGY 13.68 Increased By ▲ 0.57 (4.35%)
CSIL 6.30 Decreased By ▼ -0.11 (-1.72%)
FCCL 57.55 Decreased By ▼ -0.51 (-0.88%)
FFL 16.50 Increased By ▲ 0.27 (1.66%)
FNEL 1.20 Decreased By ▼ -0.01 (-0.83%)
KEL 7.36 Decreased By ▼ -0.07 (-0.94%)
KOSM 5.98 Decreased By ▼ -0.05 (-0.83%)
LOTCHEM 27.51 Decreased By ▼ -0.16 (-0.58%)
MLCF 101.93 Decreased By ▼ -0.82 (-0.8%)
NBP 203.29 Decreased By ▼ -1.77 (-0.86%)
NCPL 60.47 Increased By ▲ 0.84 (1.41%)
NPL 69.80 Increased By ▲ 1.24 (1.81%)
OGDC 318.48 Decreased By ▼ -0.44 (-0.14%)
PACE 11.12 Increased By ▲ 0.07 (0.63%)
PAEL 42.86 Decreased By ▼ -0.24 (-0.56%)
PIBTL 16.72 Increased By ▲ 0.09 (0.54%)
PPL 230.62 Increased By ▲ 1.17 (0.51%)
PRL 76.73 Increased By ▲ 5.93 (8.38%)
PTC 71.18 Increased By ▲ 0.18 (0.25%)
SSGC 27.10 Decreased By ▼ -0.31 (-1.13%)
TBL 10.28 Decreased By ▼ -0.03 (-0.29%)
TELE 8.56 Increased By ▲ 0.03 (0.35%)
TPL 23.59 Increased By ▲ 0.53 (2.3%)
TPLP 15.45 Decreased By ▼ -0.31 (-1.97%)
TREET 24.51 Decreased By ▼ -0.20 (-0.81%)
TRG 60.09 Decreased By ▼ -0.20 (-0.33%)

KARACHI: K-Electric’s 560 MW Bin Qasim Power Station II (BQPS-II) was recognized for 2 awards at the global stage at the Asian Power Awards 2024.

The privatized utility secured accolades in two categories: Gas Power Project of the Year – Pakistan, and Power Plant Upgrade of the Year – Pakistan. The infrastructure upgrades in the project enhance the availability and reliability of the high-efficiency power plant which was inducted into KE’s generation fleet under the USD 4 billion investment across the value chain post-privatization.

The company modified the infrastructure of the project to enable usage of RLNG as a secondary fuel, while also reducing auxiliary load requirements. Resultantly, the plant’s net efficiency has improved, leading to increased operational flexibility to meet the growing demands of the metropolis.

These advancements highlight BQPS-II's role as a leader in the power generation sector and provide a model for sustainable and resilient energy solutions in Pakistan.

The Asian Power Awards are among the most prestigious recognitions in the energy industry, honoring organizations that have implemented innovative and transformative solutions to meet the growing demand for energy while addressing sustainability.

KE’s success ranked alongside leading international players such as Dubai Electric and Water Authority (DEWA) and China Resources Power Holding Company Limited which serves China with approximately 80 GW of electricity.

KE’s success at this event underscores its position as a forward-thinking energy provider, leading the way with advanced technological solutions that deliver tangible benefits to both customers and the environment.

KE’s leadership in embracing cutting-edge technologies has been instrumental in modernizing its operations. The company recently received NEPRA’s decision on its generation tariff petition for the control period post 2023.

While the determination will not affect rates charged to customers, it is a significant milestone for the utility towards realizing its USD 2 billion investment plan until 2030. Additionally, the company recently successfully concluded the competitive bidding process on 640 MW of renewable energy projects in Balochistan and Sindh, which received the country’s lowest tariff bid for RE generation.

These projects are under KE’s Power Acquisition Program (PAP) which envisions addition of 1300 MW of renewable energy to further drive sustainability into its power production capabilities.

Commenting on the prestigious recognition, Abbas Husain, Chief Generation & Transmission Officer at K-Electric, shared “It’s an honor to be recognized alongside notable international power sector players. We continue to explore ways to push the envelope of innovation, adapting to ensure reliable and economic power supply to customers.

While the costs of electricity charged to customers are a federal subject, we want to leverage our resources to bring in more efficiency and reduce the cost of production while enhancing the available electricity supply. We are committed to pushing the boundaries of what is possible in power generation and distribution.”

Copyright Business Recorder, 2024

Comments

Comments are closed for this article.