BR100 Decreased By (-0.34%)
BR30 Decreased By (-0.73%)
KSE100 Decreased By (-0.13%)
KSE30 Decreased By (-0.21%)
AGHA 7.50 Increased By ▲ 0.02 (0.27%)
BECO 5.27 Decreased By ▼ -0.03 (-0.57%)
BML 57.17 Decreased By ▼ -0.05 (-0.09%)
BOP 33.79 Decreased By ▼ -0.13 (-0.38%)
CNERGY 11.02 Decreased By ▼ -0.08 (-0.72%)
CSIL 5.90 Decreased By ▼ -0.16 (-2.64%)
FCCL 55.48 Decreased By ▼ -0.42 (-0.75%)
FFL 16.11 Increased By ▲ 0.03 (0.19%)
FNEL 1.21 No Change ▼ 0.00 (0%)
KEL 7.26 Decreased By ▼ -0.04 (-0.55%)
KOSM 6.12 Increased By ▲ 0.02 (0.33%)
LOTCHEM 27.06 Decreased By ▼ -0.23 (-0.84%)
MLCF 96.38 Decreased By ▼ -1.07 (-1.1%)
NBP 204.13 Decreased By ▼ -0.31 (-0.15%)
NCPL 55.89 Decreased By ▼ -0.26 (-0.46%)
NPL 65.84 Decreased By ▼ -0.14 (-0.21%)
OGDC 315.49 Decreased By ▼ -3.60 (-1.13%)
PACE 10.60 Decreased By ▼ -0.06 (-0.56%)
PAEL 42.40 Decreased By ▼ -0.12 (-0.28%)
PIBTL 16.90 Decreased By ▼ -0.18 (-1.05%)
PPL 219.35 Decreased By ▼ -1.97 (-0.89%)
PRL 63.50 Increased By ▲ 0.08 (0.13%)
PTC 71.70 Decreased By ▼ -0.79 (-1.09%)
SSGC 27.31 Increased By ▲ 1.38 (5.32%)
TBL 9.70 Decreased By ▼ -0.02 (-0.21%)
TELE 8.47 Increased By ▲ 0.01 (0.12%)
TPL 21.09 Decreased By ▼ -0.38 (-1.77%)
TPLP 15.32 Increased By ▲ 0.61 (4.15%)
TREET 23.14 Decreased By ▼ -0.05 (-0.22%)
TRG 61.00 Increased By ▲ 0.19 (0.31%)

LAHORE: Electricity generation from Neelum Jhelum Hydel Power Station has been restricted to 530 MW due to decrease in head race tunnel pressure on April 03, 2024.

This precautionary measure has been taken to observe the behaviour of pressure fluctuation. Generation from the power station will be increased gradually after analysis and deliberations with the project consultants.

Neelum Jhelum Hydel Power Station remained on full generation of 969 MW from March 28, 2024.

It is important to note that all possible maintenance has been carried out during the observation. This maintenance includes cleaning of trash racks installed at the intake gates in the reservoir, flushing of all three de-sanders, flushing of pressure gauge installed at the power house and inspection of the spiral cases of the generating units.

Copyright Business Recorder, 2024

Comments

Comments are closed for this article.