BR100 Decreased By (-0.23%)
BR30 Decreased By (-0.01%)
KSE100 Decreased By (-0.19%)
KSE30 Decreased By (-0.24%)
AGHA 7.74 Increased By ▲ 0.05 (0.65%)
BECO 5.29 Decreased By ▼ -0.02 (-0.38%)
BML 60.01 Decreased By ▼ -1.22 (-1.99%)
BOP 36.46 Increased By ▲ 0.46 (1.28%)
CNERGY 11.94 Increased By ▲ 0.69 (6.13%)
CSIL 6.17 No Change ▼ 0.00 (0%)
FCCL 57.36 Increased By ▲ 0.48 (0.84%)
FFL 16.58 Increased By ▲ 0.07 (0.42%)
FNEL 1.20 No Change ▼ 0.00 (0%)
KEL 7.32 Decreased By ▼ -0.10 (-1.35%)
KOSM 6.05 No Change ▼ 0.00 (0%)
LOTCHEM 27.14 Decreased By ▼ -0.06 (-0.22%)
MLCF 102.07 Decreased By ▼ -1.02 (-0.99%)
NBP 206.35 Decreased By ▼ -1.28 (-0.62%)
NCPL 62.62 Increased By ▲ 0.70 (1.13%)
NPL 71.98 Decreased By ▼ -0.20 (-0.28%)
OGDC 319.19 Increased By ▲ 0.70 (0.22%)
PACE 11.38 Increased By ▲ 0.32 (2.89%)
PAEL 43.88 Decreased By ▼ -0.50 (-1.13%)
PIBTL 16.84 Decreased By ▼ -0.06 (-0.36%)
PPL 221.55 Decreased By ▼ -0.93 (-0.42%)
PRL 63.75 Decreased By ▼ -0.06 (-0.09%)
PTC 72.41 Decreased By ▼ -0.75 (-1.03%)
SSGC 27.28 Increased By ▲ 0.03 (0.11%)
TBL 9.86 Decreased By ▼ -0.02 (-0.2%)
TELE 8.62 Decreased By ▼ -0.19 (-2.16%)
TPL 20.68 Increased By ▲ 0.34 (1.67%)
TPLP 14.98 Increased By ▲ 0.01 (0.07%)
TREET 24.10 No Change ▼ 0.00 (0%)
TRG 63.29 Increased By ▲ 0.92 (1.48%)

KARACHI: Imran Maniar, MD, SSGC performed the ground-breaking of the 24 inch dia, 31-km gas pipeline project from Sales Meter Station (SMS) Kathore to SMS Surjani for the supply of gas to the western region.

The project was proposed to mitigate low-pressure problems in the existing 12 inch /20 inch dia. Distribution ACPL lines and to meet the rising demand of SITE Area and HUB Town and to improve the operational efficiency of Distribution system.

The groundbreaking ceremony was performed at the site of the ACPL’s main valve assembly. The above-mentioned project is being built at a cost of Rs 5.1 billion and is scheduled to be completed by June 2024.

The groundbreaking ceremony was also attended by Saeed Rizvi, DMD (Operations), Ghulam Moeen Butt, ASGM (Technical Services), Jamshed Nisar, ASGM (Transmission), Ghulam Ali Mahar, DGM/Incharge (Projects & Construction) and other company executives, technicians and workers.

Copyright Business Recorder, 2024

Comments

Comments are closed for this article.