BR100 Increased By (0.48%)
BR30 Increased By (0.63%)
KSE100 Increased By (0.34%)
KSE30 Increased By (0.34%)
BECO 6.07 Increased By ▲ 0.30 (5.2%)
BML 52.55 Decreased By ▼ -0.45 (-0.85%)
BOP 34.30 Increased By ▲ 0.31 (0.91%)
CNERGY 8.15 Increased By ▲ 0.04 (0.49%)
DCL 12.15 Decreased By ▼ -0.05 (-0.41%)
FCCL 53.39 Increased By ▲ 0.56 (1.06%)
FCSC 5.15 Increased By ▲ 0.08 (1.58%)
FFL 18.03 Increased By ▲ 0.08 (0.45%)
FNEL 1.32 Increased By ▲ 0.03 (2.33%)
HUMNL 10.88 No Change ▼ 0.00 (0%)
KEL 8.10 Increased By ▲ 0.08 (1%)
KOSM 5.35 Decreased By ▼ -0.17 (-3.08%)
MLCF 86.98 Increased By ▲ 0.47 (0.54%)
NBP 186.80 Increased By ▲ 1.64 (0.89%)
PACE 10.62 Increased By ▲ 0.04 (0.38%)
PAEL 39.71 Increased By ▲ 0.29 (0.74%)
PIAHCLA 26.14 Decreased By ▼ -0.08 (-0.31%)
PIBTL 16.89 Increased By ▲ 0.22 (1.32%)
PPL 229.28 Increased By ▲ 1.10 (0.48%)
PRL 34.85 Increased By ▲ 0.17 (0.49%)
PTC 66.78 Increased By ▲ 1.45 (2.22%)
SEARL 90.68 Increased By ▲ 0.55 (0.61%)
SSGC 27.06 Increased By ▲ 0.46 (1.73%)
TELE 8.59 Increased By ▲ 0.31 (3.74%)
THCCL 58.01 Decreased By ▼ -0.49 (-0.84%)
TPLP 8.61 Increased By ▲ 0.39 (4.74%)
TREET 24.59 Increased By ▲ 0.06 (0.24%)
TRG 69.62 Decreased By ▼ -0.09 (-0.13%)
WAVES 9.89 Decreased By ▼ -0.05 (-0.5%)
WTL 1.29 Increased By ▲ 0.01 (0.78%)

LAHORE: The National Transmission and Despatch Company (NTDC) has completed the 500kV Thar-Matiari Transmission line in a record time of two and a half months, meeting the directive of Prime Minister Shehbaz Sharif and Federal Minister for Power Engr. Khurram Dastgir Khan.

The 220 kilometer long transmission line was completed at a cost of approximately Rs 15 billion using the company’s own resources to add affordable energy in national grid.

This project is vital for future energy needs, as it will connect coal-fired power generation in Thar to the rest of the country. The transmission line has connected the 1320 MW Shanghai Electric coal plant in Thar with Matiari Converter station near Hyderabad, improving the country’s power transmission system.

The Polan-Jiwani transmission line, which aimed to import 100 MW of electricity from Iran for Gwadar, was also completed by NTDC in record time under the leadership of MD NTDC Engr. Dr Rana Abdul Jabbar Khan.

Copyright Business Recorder, 2023

Comments

Comments are closed for this article.