BR100 Increased By (0.01%)
BR30 Increased By (0.53%)
KSE100 Increased By (0.28%)
KSE30 Increased By (0.29%)
AGHA 6.38 Increased By ▲ 0.06 (0.95%)
BECO 4.35 Increased By ▲ 0.08 (1.87%)
BML 62.55 Increased By ▲ 0.10 (0.16%)
BOP 31.39 Increased By ▲ 0.16 (0.51%)
CNERGY 11.73 Increased By ▲ 0.14 (1.21%)
CSIL 5.91 Increased By ▲ 0.19 (3.32%)
FCCL 61.71 Increased By ▲ 0.17 (0.28%)
FFL 14.79 Decreased By ▼ -0.23 (-1.53%)
FNEL 1.24 Increased By ▲ 0.01 (0.81%)
KEL 6.32 Increased By ▲ 0.06 (0.96%)
KOSM 5.90 Increased By ▲ 0.34 (6.12%)
LOTCHEM 24.69 Increased By ▲ 0.01 (0.04%)
MLCF 103.93 Decreased By ▼ -0.15 (-0.14%)
NBP 173.32 Decreased By ▼ -1.96 (-1.12%)
NCPL 51.83 Decreased By ▼ -0.94 (-1.78%)
NPL 54.03 Decreased By ▼ -0.09 (-0.17%)
OGDC 315.87 Increased By ▲ 2.48 (0.79%)
PACE 9.26 Increased By ▲ 0.06 (0.65%)
PAEL 35.58 Decreased By ▼ -0.22 (-0.61%)
PIBTL 13.66 Increased By ▲ 0.19 (1.41%)
PPL 226.07 Increased By ▲ 4.26 (1.92%)
PRL 80.28 Increased By ▲ 1.20 (1.52%)
PTC 46.64 Decreased By ▼ -0.21 (-0.45%)
SSGC 23.82 Decreased By ▼ -0.05 (-0.21%)
TBL 9.24 Decreased By ▼ -0.07 (-0.75%)
TELE 7.55 Increased By ▲ 0.16 (2.17%)
TPL 24.54 Decreased By ▼ -0.57 (-2.27%)
TPLP 12.99 Increased By ▲ 0.48 (3.84%)
TREET 25.98 Decreased By ▼ -0.27 (-1.03%)
TRG 53.33 Decreased By ▼ -0.11 (-0.21%)

KARACHI: Administrator Karachi Laeeq Ahmed on Sunday said that the expansion joints of Nagan Chowrangi Flyover are being repaired on priority basis.

"The joints were in bad condition due to which there was a risk of accidents so they are being made useable. Joints will also be replaced where necessary," the Administrator expressed these views while inspecting the ongoing works under the Engineering Department of KMC in different areas of the city. He said that the work is also underway to fix the lights on the expressway to ease traffic at night. He said that KMC is carrying out infrastructure maintenance work with its own resources with the aim of improving roads and highways.

The Administrator Karachi directed Director General Works Shabihul Hasnain Zaidi to inspect the expansion joints of all flyovers and wherever repairs or change are needed, work should be started immediately.

Ahmed said that light and heavy vehicles were plying on Nagan Chowrangi flyover 24 hours a day so the repair work should be done in such a way as to minimize traffic congestion and complete the work expeditiously.

He said that earlier the expansion joints of Liaquatabad and Gharibabad flyovers have been replaced, after which the flow of traffic has improved. The smoothing of the road has also significantly reduced the travel time.

Copyright Business Recorder, 2021

Comments

Comments are closed for this article.