AIRLINK 72.59 Increased By ▲ 3.39 (4.9%)
BOP 4.99 Increased By ▲ 0.09 (1.84%)
CNERGY 4.29 Increased By ▲ 0.03 (0.7%)
DFML 31.71 Increased By ▲ 0.46 (1.47%)
DGKC 80.90 Increased By ▲ 3.65 (4.72%)
FCCL 21.42 Increased By ▲ 1.42 (7.1%)
FFBL 35.19 Increased By ▲ 0.19 (0.54%)
FFL 9.33 Increased By ▲ 0.21 (2.3%)
GGL 9.82 Increased By ▲ 0.02 (0.2%)
HBL 112.40 Decreased By ▼ -0.36 (-0.32%)
HUBC 136.50 Increased By ▲ 3.46 (2.6%)
HUMNL 7.14 Increased By ▲ 0.19 (2.73%)
KEL 4.35 Increased By ▲ 0.12 (2.84%)
KOSM 4.35 Increased By ▲ 0.10 (2.35%)
MLCF 37.67 Increased By ▲ 1.07 (2.92%)
OGDC 137.75 Increased By ▲ 4.88 (3.67%)
PAEL 23.41 Increased By ▲ 0.77 (3.4%)
PIAA 24.55 Increased By ▲ 0.35 (1.45%)
PIBTL 6.63 Increased By ▲ 0.17 (2.63%)
PPL 125.05 Increased By ▲ 8.75 (7.52%)
PRL 26.99 Increased By ▲ 1.09 (4.21%)
PTC 13.32 Increased By ▲ 0.24 (1.83%)
SEARL 52.70 Increased By ▲ 0.70 (1.35%)
SNGP 70.80 Increased By ▲ 3.20 (4.73%)
SSGC 10.54 No Change ▼ 0.00 (0%)
TELE 8.33 Increased By ▲ 0.05 (0.6%)
TPLP 10.95 Increased By ▲ 0.15 (1.39%)
TRG 60.60 Increased By ▲ 1.31 (2.21%)
UNITY 25.10 Decreased By ▼ -0.03 (-0.12%)
WTL 1.28 Increased By ▲ 0.01 (0.79%)
BR100 7,546 Increased By 137.4 (1.85%)
BR30 24,809 Increased By 772.4 (3.21%)
KSE100 71,902 Increased By 1235.2 (1.75%)
KSE30 23,595 Increased By 371 (1.6%)
Pakistan

Mohmand & Bhasha – Pakistan to get two big water dams after five decades: PM

  • A video shared by Prime Minister Khan on twitter showed the under-construction site with diversion tunnels, outlet portals, access tunnel and re-regulation pond.
Published December 8, 2020

ISLAMABAD: Prime Minister Imran Khan on Tuesday said five decades after Mangla and Tarbela, Pakistan was going to have another two big water dams – Mohmand and Bhasha.

A video shared by Prime Minister Khan on twitter showed the under-construction site with diversion tunnels, outlet portals, access tunnel and re-regulation pond.

Being built on Swat River, the Mohmand Dam will generate 800 MW of hydroelectricity, irrigate over 16,000 acres of land and contribute heavily to the socio-economic uplift of the region.

Prime Minister Imran Khan had performed the ground-breaking of Mohmand Dam on May 2, 2019.

Besides hydropower generation, Mohmand Dam will help mitigate floods and ensure socio-economic uplift of the people of area. The site will be lined with around 1,000 trees to maintain the balance of environment.

Other sideline projects include, installation of solar panels at high schools and mosques and development of community infrastructure.

The Diamer Bhasha is being built on Indus River near Chilas in Khyber Pukhtunkhwa and Gilgit Baltistan, 315 km from Tarbela Dam and about 40 km downstream of Chilas.

Prime Minister Imran Khan had kicked off the mega construction work at Diamer-Bhasha Dam on July 15 this year.

The dam will produce 4,500 inexpensive and green hydel power.

The 272-metre high, having capacity of 6.4 million acre feet water reservoir, will be the country’s third big dam after Tarbela and Mangla dams.

Comments

Comments are closed.