AIRLINK 72.59 Increased By ▲ 3.39 (4.9%)
BOP 4.99 Increased By ▲ 0.09 (1.84%)
CNERGY 4.29 Increased By ▲ 0.03 (0.7%)
DFML 31.71 Increased By ▲ 0.46 (1.47%)
DGKC 80.90 Increased By ▲ 3.65 (4.72%)
FCCL 21.42 Increased By ▲ 1.42 (7.1%)
FFBL 35.19 Increased By ▲ 0.19 (0.54%)
FFL 9.33 Increased By ▲ 0.21 (2.3%)
GGL 9.82 Increased By ▲ 0.02 (0.2%)
HBL 112.40 Decreased By ▼ -0.36 (-0.32%)
HUBC 136.50 Increased By ▲ 3.46 (2.6%)
HUMNL 7.14 Increased By ▲ 0.19 (2.73%)
KEL 4.35 Increased By ▲ 0.12 (2.84%)
KOSM 4.35 Increased By ▲ 0.10 (2.35%)
MLCF 37.67 Increased By ▲ 1.07 (2.92%)
OGDC 137.75 Increased By ▲ 4.88 (3.67%)
PAEL 23.41 Increased By ▲ 0.77 (3.4%)
PIAA 24.55 Increased By ▲ 0.35 (1.45%)
PIBTL 6.63 Increased By ▲ 0.17 (2.63%)
PPL 125.05 Increased By ▲ 8.75 (7.52%)
PRL 26.99 Increased By ▲ 1.09 (4.21%)
PTC 13.32 Increased By ▲ 0.24 (1.83%)
SEARL 52.70 Increased By ▲ 0.70 (1.35%)
SNGP 70.80 Increased By ▲ 3.20 (4.73%)
SSGC 10.54 No Change ▼ 0.00 (0%)
TELE 8.33 Increased By ▲ 0.05 (0.6%)
TPLP 10.95 Increased By ▲ 0.15 (1.39%)
TRG 60.60 Increased By ▲ 1.31 (2.21%)
UNITY 25.10 Decreased By ▼ -0.03 (-0.12%)
WTL 1.28 Increased By ▲ 0.01 (0.79%)
BR100 7,566 Increased By 157.7 (2.13%)
BR30 24,786 Increased By 749.4 (3.12%)
KSE100 71,902 Increased By 1235.2 (1.75%)
KSE30 23,595 Increased By 371 (1.6%)
Pakistan

Over 7,000 MW added to national grid system in last 4 years

ISLAMABAD: The incumbent government since its inception in 2013 has added over 7,000 MW electricity to the national
Published September 8, 2017

ISLAMABAD: The incumbent government since its inception in 2013 has added over 7,000 MW electricity to the national system so far.

An official sources told APP here that out of total, 474 MW electricity was added in 2013, 1422 MW in 2014, 717 MW in 2015, 920 MW in 2016 and over 4000 MW till August 2017.

In 2013, the projects which were completed included New Bong Escape (84 MW), Allai Khwar (121 MW0, Khan Khwar (72 MW), Jinnah Hydel Unit No. 4, 5, 6,7 and 8 (60 MW), FFCEL (Wind 50 MW), Gomal Zam (17 MW), Devis (Gas 13 MW) and ZEPL (Wind 56 MW).

The project completed in 2014 were included Dubair Khawar (130 MW), Uch-II (Gas 393 MW), JDW-II and JDW-III (Bagasse (53 MW), TGF (Wind 50 MW), FWEL-II (Wind 50 MW) and Guddu (Gas 747 MW).

Some 717 MW electricity was added to the national grid during 2015 from the projects included RYKML (Bagasse 30 MW), FWEL-I (Wind 50 MW), Quaid Azam (Solar 100 MW), Nandipur (425 MW), Sapphire (Wind 50 MW) and Chiniot (Bagasse 62 MW).

Similarly, a total 920 MW electricity was added to the power generation system during 2016 and the projects were included APOLO Solar (100 MW), Best Green Solar (100 MW), Crest Energy Solar (100 MW), Younis (Wind 50 MW), Metro (Wind 50 MW), Tapal (Wind 30 MW), Master Wind (50 MW), Tenaga (Wind 50 MW), Gul Ahmed (Wind 50 MW) and Chashnupp III (Nuclear 340 MW).

The projects which were completed in 2017 included LNG based plants in Bhikki (800 MW), CHASHNUPP-IV (340 MW), LNG based Plants in Balloki (800 MW), Port Qasim Power Project Unit-1 (660 MW), Patrind Hydropower Project 147 (MW), (470 MW), Golen Hol, M/s United Energy Pakistan etc.

The sources said additional projects of 2250 MW capacity would be completed after 2018. Giving the details, they said, work on 600 MW Engro Thar Coal project also continued on fast track which would produce 300 MW electricity by 2017 and additional 300 MW by 2018.

As many as 300 MW would be added in the national gird from Salt Range Mine Mouth Power Project by end of 2018 while the Hubco would give 660 MW to national gird by 2018.

Work on Thar Block-I has also been initiated to produce 660 MW electricity by 2018 and additional 660 MW after the year 2018.

Meanwhile, the power regulator has also reported an increase of 14% in power production to 12,496.63 gigawatt-hour (GWh) in July from 10,991.82 GWh in the same month of previous year. RLNG (re-gasified liquefied natural gas), nuclear and coal-based generation registered a year-on-year surge of 51.4%, 93.7% and 68.2 times, respectively.

Copyright APP (Associated Press of Pakistan), 2017

Comments

Comments are closed.