SEOUL: Korea Midland Power Co Ltd (KOMIPO) is seeking 780,000 tonnes of bituminous coal for the Boryeong power plant via tenders, the utility said on its website (http://www.komipo.co.kr/kom_eng).
The tender will close at 2 p.m. (0500 GMT) on June 24, 2016.
The first tender for 500,000 tonnes of coal should be divided into 4 shipments of 125,000 tonnes of coal each, with the first two shipments to be made in August-September and the remaining two in 3Q-4Q 2016. The bids should be made on a free-on-board-trimmed (FOBT) basis only.
The second tender for 280,000 tonnes of coal should be made in 4 shipments of 70,000 tonnes, to be shipped in 3Q-4Q 2016. The bids can be made on a FOBT or cost-and-freight (CFR) basis.





















Comments
Comments are closed for this article.