AIRLINK 74.60 Decreased By ▼ -0.65 (-0.86%)
BOP 5.14 Increased By ▲ 0.03 (0.59%)
CNERGY 4.50 Decreased By ▼ -0.10 (-2.17%)
DFML 33.00 Increased By ▲ 0.47 (1.44%)
DGKC 88.90 Decreased By ▼ -1.45 (-1.6%)
FCCL 22.55 Decreased By ▼ -0.43 (-1.87%)
FFBL 32.70 Decreased By ▼ -0.87 (-2.59%)
FFL 9.84 Decreased By ▼ -0.20 (-1.99%)
GGL 10.88 Decreased By ▼ -0.17 (-1.54%)
HBL 115.31 Increased By ▲ 0.41 (0.36%)
HUBC 136.63 Decreased By ▼ -0.71 (-0.52%)
HUMNL 9.97 Increased By ▲ 0.44 (4.62%)
KEL 4.63 Decreased By ▼ -0.03 (-0.64%)
KOSM 4.70 No Change ▼ 0.00 (0%)
MLCF 39.70 Decreased By ▼ -0.84 (-2.07%)
OGDC 138.96 Decreased By ▼ -0.79 (-0.57%)
PAEL 26.89 Decreased By ▼ -0.76 (-2.75%)
PIAA 25.15 Increased By ▲ 0.75 (3.07%)
PIBTL 6.84 Decreased By ▼ -0.08 (-1.16%)
PPL 122.74 Decreased By ▼ -2.56 (-2.04%)
PRL 27.01 Decreased By ▼ -0.54 (-1.96%)
PTC 14.00 Decreased By ▼ -0.15 (-1.06%)
SEARL 59.47 Decreased By ▼ -2.38 (-3.85%)
SNGP 71.15 Decreased By ▼ -1.83 (-2.51%)
SSGC 10.44 Decreased By ▼ -0.15 (-1.42%)
TELE 8.65 Decreased By ▼ -0.13 (-1.48%)
TPLP 11.51 Decreased By ▼ -0.22 (-1.88%)
TRG 65.13 Decreased By ▼ -1.47 (-2.21%)
UNITY 25.80 Increased By ▲ 0.65 (2.58%)
WTL 1.41 Decreased By ▼ -0.03 (-2.08%)
BR100 7,819 Increased By 16.2 (0.21%)
BR30 25,577 Decreased By -238.9 (-0.93%)
KSE100 74,664 Increased By 132.8 (0.18%)
KSE30 24,072 Increased By 117.1 (0.49%)

imageISLAMABAD: National Highway Authority (NHA) has invited Expression of lnterests (EO1s) from the construction firms to extend Islamabad-Murree Expressway (N-75) to Kohala and connect it with Muzaffarabad Expressway.

EOIs have been invited for conducting feasibility study and design of the subject project.The proposals are being evaluated and are in the process of finalization. Formalities associated with construction of the project will commence after completion of the feasibility study,said an official of the NHA Friday.

He said that the timeframe given for completion of feasibility study of the project and design is four months. Procurement process including tender with initiated soon after completion of feasibility study.

To a question,he said that the expected time by which the construction work on the said project will be initiated alongwith estimated cost will be ascertained after completion of feasibility and design of the project.

The Murree Expressway (N-75), also known as the Islamabad-Murree Expressway or the Islamabad-Murree-Muzaffarabad Expressway is a four-lane expressway connecting Islamabad to Murree.The Expressway passes through Barakahu, Murree, Phulgran, Upper Topa, Lower Topa, Bhurban, Aliyot and Phagwari before ending just outside Kohala.

Copyright APP (Associated Press of Pakistan), 2014

Comments

Comments are closed.