BR100 Increased By (1.9%)
BR30 Increased By (1.3%)
KSE100 Increased By (1.66%)
KSE30 Increased By (1.87%)
AGHA 7.47 Increased By ▲ 0.02 (0.27%)
BECO 5.30 Increased By ▲ 0.06 (1.15%)
BML 57.15 Increased By ▲ 0.41 (0.72%)
BOP 34.75 Increased By ▲ 1.05 (3.12%)
CNERGY 11.06 Increased By ▲ 0.05 (0.45%)
CSIL 5.89 Increased By ▲ 0.03 (0.51%)
FCCL 56.40 Increased By ▲ 1.26 (2.29%)
FFL 16.47 Increased By ▲ 0.37 (2.3%)
FNEL 1.21 Increased By ▲ 0.01 (0.83%)
KEL 7.36 Increased By ▲ 0.10 (1.38%)
KOSM 6.15 Increased By ▲ 0.14 (2.33%)
LOTCHEM 27.19 Increased By ▲ 0.28 (1.04%)
MLCF 98.25 Increased By ▲ 2.32 (2.42%)
NBP 206.80 Increased By ▲ 3.52 (1.73%)
NCPL 56.50 Increased By ▲ 0.77 (1.38%)
NPL 65.72 Increased By ▲ 0.67 (1.03%)
OGDC 316.45 Increased By ▲ 2.34 (0.74%)
PACE 10.94 Increased By ▲ 0.45 (4.29%)
PAEL 42.44 Increased By ▲ 0.52 (1.24%)
PIBTL 16.82 Increased By ▲ 0.08 (0.48%)
PPL 221.10 Increased By ▲ 3.38 (1.55%)
PRL 63.93 Increased By ▲ 1.23 (1.96%)
PTC 71.65 Increased By ▲ 0.19 (0.27%)
SSGC 27.20 Increased By ▲ 0.46 (1.72%)
TBL 9.75 Increased By ▲ 0.09 (0.93%)
TELE 8.75 Increased By ▲ 0.27 (3.18%)
TPL 19.29 Decreased By ▼ -0.69 (-3.45%)
TPLP 14.80 Decreased By ▼ -0.14 (-0.94%)
TREET 23.40 Increased By ▲ 0.33 (1.43%)
TRG 61.50 Increased By ▲ 0.83 (1.37%)
Pakistan

KSEW to build missile carrier craft for PN: Admiral Tayyab

Published Updated

ksewKARACHI: Karachi Shipyard and Engineering Works (KSEW) will build a Fast Attack Craft (FAC) for Pakistan Navy in collaboration with the Chinese company 'China Shipbuilding and Offshore Company (CSOC) (Pvt) Limited.

"We hope to complete the project of the 'Attack Craft' with missile carrier by April next year," said Chief of Staff, Pakistan Navy Vice Admiral Tayyab Ali Dogar, while addressing the ceremony on the occasion here on Friday.

"It is historic occasion for the country and Pakistan Navy for collaboration with the Chinese brothers on this project," he maintained.

He said that the project of missile carrier craft will further improve the defence capabilities of Pakistan in collaboration with the Chinese experts and boost the strength of Pakistan Navy.

Speaking on the occasion, the Managing Director, KSEW, Rear Admiral Hasan Nasir Hussain Shah, praised the services of the engineering sector of KSEW which would complete the project 3-weeks in advance of the scheduled time.

"The craft will have maximum speed of 30 knots propelled by 4- diesel engines" Shah said.

The craft boat will be equipped with latest weapons and sensors, he maintained.

The MD KSEW said that the yard successfully constructed a number of warships including missile crafts, tugs and fabricated many of the utility ships.

"We are capable enough to meet all shipbuilding requirements of the maritime sector," he added.

Copyright APP (Associated Press of Pakistan), 2011

Comments

Comments are closed for this article.