By
Output at Oseberg was down 8.2 mcm while output at Heimdal was down 6.2 mcm, Gassco said. Both outages are expected to last 4 to 12 hours, although the duration was uncertain, Gassco said.
The outages come on top of a 4.5 mcm/day outage at Sleipner.