By
According to daily data released by National Transmission and Dispatch Company Limited (NTDC), the hydel generation stood at 2,730 MW, Thermal 1,500 and Independent Power Producers (IPPs) 4,770 MW.
The hydel generation also improved as the Indus River System Authority (IRSA) has increased water discharge from both water reservoirs, Tarbela and Mangla dams.
Meanwhile, supply of 350 MW from Pakgen power plant has been suspended to the national grid station due to boiler tube leakage.