BR100 Increased By (0.01%)
BR30 Increased By (0.53%)
KSE100 Increased By (0.28%)
KSE30 Increased By (0.29%)
AGHA 6.38 Increased By ▲ 0.06 (0.95%)
BECO 4.35 Increased By ▲ 0.08 (1.87%)
BML 62.55 Increased By ▲ 0.10 (0.16%)
BOP 31.39 Increased By ▲ 0.16 (0.51%)
CNERGY 11.73 Increased By ▲ 0.14 (1.21%)
CSIL 5.91 Increased By ▲ 0.19 (3.32%)
FCCL 61.71 Increased By ▲ 0.17 (0.28%)
FFL 14.79 Decreased By ▼ -0.23 (-1.53%)
FNEL 1.24 Increased By ▲ 0.01 (0.81%)
KEL 6.32 Increased By ▲ 0.06 (0.96%)
KOSM 5.90 Increased By ▲ 0.34 (6.12%)
LOTCHEM 24.69 Increased By ▲ 0.01 (0.04%)
MLCF 103.93 Decreased By ▼ -0.15 (-0.14%)
NBP 173.32 Decreased By ▼ -1.96 (-1.12%)
NCPL 51.83 Decreased By ▼ -0.94 (-1.78%)
NPL 54.03 Decreased By ▼ -0.09 (-0.17%)
OGDC 315.87 Increased By ▲ 2.48 (0.79%)
PACE 9.26 Increased By ▲ 0.06 (0.65%)
PAEL 35.58 Decreased By ▼ -0.22 (-0.61%)
PIBTL 13.66 Increased By ▲ 0.19 (1.41%)
PPL 226.07 Increased By ▲ 4.26 (1.92%)
PRL 80.28 Increased By ▲ 1.20 (1.52%)
PTC 46.64 Decreased By ▼ -0.21 (-0.45%)
SSGC 23.82 Decreased By ▼ -0.05 (-0.21%)
TBL 9.24 Decreased By ▼ -0.07 (-0.75%)
TELE 7.55 Increased By ▲ 0.16 (2.17%)
TPL 24.54 Decreased By ▼ -0.57 (-2.27%)
TPLP 12.99 Increased By ▲ 0.48 (3.84%)
TREET 25.98 Decreased By ▼ -0.27 (-1.03%)
TRG 53.33 Decreased By ▼ -0.11 (-0.21%)

ISLAMABAD: The Asian Development Bank (ADB) has proposed a USD 130 million loan-financed project for strengthening Pakistan’s power distribution network through the deployment of advanced digital technologies across five electricity distribution companies (Discos).

According to project details, the proposed Second Power Distribution Strengthening Project (PDSP-II) will support the rollout of Asset Performance Management Systems (APMS), Advanced Metering Infrastructure (AMI), and associated data management and analytics platforms to improve operational efficiency, reliability, and climate resilience of power distribution services.

The project is currently at the proposed stage, with fact-finding missions scheduled from June 1 to June 30, 2026, following concept clearance granted on March 9, 2026.

READ MORE: Pakistan pushes indigenous energy generation as ADB pledges support

Under the initiative, the ADB plans to extend interventions introduced under the first Power Distribution Strengthening Project to the Peshawar Electric Supply Company (PESCO), Hazara Electric Supply Company (HAZECO), Quetta Electric Supply Company (QESCO), while expanding coverage in Lahore Electric Supply Company (LESCO) and Sukkur Electric Power Company (SEPCO).

The ADB noted that Pakistan’s power sector continues to face significant operational and financial challenges, including high technical and commercial losses, weak revenue recovery, poor asset utilization, and limited digital visibility across distribution networks. These weaknesses contribute to frequent power outages, unstable supply, and declining service quality for consumers.

The lender observed that distribution companies remain constrained by inadequate deployment of modern technologies, including real-time monitoring systems and predictive analytics needed to manage overloaded transformers, high-loss feeders, and network reliability issues.

“The project addresses these binding constraints by scaling up APMS and AMI to improve network visibility, enable predictive maintenance, reduce losses, and strengthen the operational accountability of Discos,” the project document stated.

According to ADB, the initiative is expected to improve outage response times, enhance billing integrity, support a reduction in circular debt, and strengthen the climate resilience of electricity distribution infrastructure, particularly in areas vulnerable to extreme weather events.

The project’s intended impact is to support economic development in targeted regions through an affordable, secure, and sustainable energy supply. Its primary outcome will be improved operational efficiency, reliability, and climate resilience of participating Discos. Upon approval, the project is expected to accelerate the digital transformation of Pakistan’s power distribution sector and contribute to broader government efforts aimed at improving energy sector governance, reducing losses, and enhancing service delivery to consumers nationwide.

Copyright Business Recorder, 2026

Comments

200 characters remaining
Shamshad Ahmed Jun 02, 2026 02:17pm
Why all project runs on ADP and WB loans? Where tax payer money going? Will ADP do audit? 50 % loans will be spent on luxurious Vehicles for the executive and political appoitee
0 Reply