BR100 Increased By (0.39%)
BR30 Increased By (0.47%)
KSE100 Increased By (0.6%)
KSE30 Increased By (0.7%)
AGHA 6.55 Increased By ▲ 0.23 (3.64%)
BECO 4.40 Increased By ▲ 0.13 (3.04%)
BML 62.43 Decreased By ▼ -0.02 (-0.03%)
BOP 31.38 Increased By ▲ 0.15 (0.48%)
CNERGY 11.79 Increased By ▲ 0.20 (1.73%)
CSIL 5.95 Increased By ▲ 0.23 (4.02%)
FCCL 61.12 Decreased By ▼ -0.42 (-0.68%)
FFL 14.88 Decreased By ▼ -0.14 (-0.93%)
FNEL 1.24 Increased By ▲ 0.01 (0.81%)
KEL 6.29 Increased By ▲ 0.03 (0.48%)
KOSM 6.00 Increased By ▲ 0.44 (7.91%)
LOTCHEM 24.85 Increased By ▲ 0.17 (0.69%)
MLCF 104.13 Increased By ▲ 0.05 (0.05%)
NBP 174.66 Decreased By ▼ -0.62 (-0.35%)
NCPL 52.83 Increased By ▲ 0.06 (0.11%)
NPL 54.48 Increased By ▲ 0.36 (0.67%)
OGDC 315.35 Increased By ▲ 1.96 (0.63%)
PACE 9.41 Increased By ▲ 0.21 (2.28%)
PAEL 35.62 Decreased By ▼ -0.18 (-0.5%)
PIBTL 13.71 Increased By ▲ 0.24 (1.78%)
PPL 223.38 Increased By ▲ 1.57 (0.71%)
PRL 80.79 Increased By ▲ 1.71 (2.16%)
PTC 47.15 Increased By ▲ 0.30 (0.64%)
SSGC 24.15 Increased By ▲ 0.28 (1.17%)
TBL 9.25 Decreased By ▼ -0.06 (-0.64%)
TELE 7.53 Increased By ▲ 0.14 (1.89%)
TPL 24.89 Decreased By ▼ -0.22 (-0.88%)
TPLP 12.88 Increased By ▲ 0.37 (2.96%)
TREET 26.10 Decreased By ▼ -0.15 (-0.57%)
TRG 53.75 Increased By ▲ 0.31 (0.58%)

Federal Minister for Power Awais Ahmed Khan Leghari on Friday announced the end of load management across the country following the arrival of LNG cargo, saying the improved fuel supply has restored stability to the power system.

In a video message, Leghari noted that Pakistan experienced varying levels of load shedding from April 13, including up to five hours, which increased to around seven hours before reducing to minimal levels.

He said the electricity shortfall was not due to systematic constraints, but because of fuel supply constraints.

“We were unable to procure gas, needed to generate electricity, due to the Iran-US war. And if we generated electricity from diesel and furnace oil, then this electricity will be very expensive, and it will affect our consumers.”

Discos from SPPs and CPPs: Leghari takes notice of electricity procurement

The minister said additional gas supplies, which were purchased on spot rates, have arrived.

Moreover, hydropower generation in the country has improved, rising from around 1,000 MW to nearly 6,000 MW.

Leghari said Pakistan’s installed generation capacity stands at 32,000 MW, and claims of higher figures circulating in public were inaccurate.

He expressed hope that, with improved fuel availability and timely interventions, the country would not face a return to prolonged load shedding.

“Load shedding will not return to previous levels.”

Comments

Comments are closed for this article.