BR100 Increased By (0.4%)
BR30 Increased By (0.6%)
KSE100 Increased By (0.29%)
KSE30 Increased By (0.26%)
BECO 6.12 Increased By ▲ 0.35 (6.07%)
BML 52.70 Decreased By ▼ -0.30 (-0.57%)
BOP 34.27 Increased By ▲ 0.28 (0.82%)
CNERGY 8.15 Increased By ▲ 0.04 (0.49%)
DCL 12.10 Decreased By ▼ -0.10 (-0.82%)
FCCL 53.30 Increased By ▲ 0.47 (0.89%)
FCSC 5.17 Increased By ▲ 0.10 (1.97%)
FFL 18.01 Increased By ▲ 0.06 (0.33%)
FNEL 1.31 Increased By ▲ 0.02 (1.55%)
HUMNL 10.88 No Change ▼ 0.00 (0%)
KEL 8.12 Increased By ▲ 0.10 (1.25%)
KOSM 5.35 Decreased By ▼ -0.17 (-3.08%)
MLCF 86.96 Increased By ▲ 0.45 (0.52%)
NBP 186.50 Increased By ▲ 1.34 (0.72%)
PACE 10.68 Increased By ▲ 0.10 (0.95%)
PAEL 39.79 Increased By ▲ 0.37 (0.94%)
PIAHCLA 26.17 Decreased By ▼ -0.05 (-0.19%)
PIBTL 16.92 Increased By ▲ 0.25 (1.5%)
PPL 228.78 Increased By ▲ 0.60 (0.26%)
PRL 34.85 Increased By ▲ 0.17 (0.49%)
PTC 66.74 Increased By ▲ 1.41 (2.16%)
SEARL 90.55 Increased By ▲ 0.42 (0.47%)
SSGC 27.04 Increased By ▲ 0.44 (1.65%)
TELE 8.62 Increased By ▲ 0.34 (4.11%)
THCCL 58.30 Decreased By ▼ -0.20 (-0.34%)
TPLP 8.63 Increased By ▲ 0.41 (4.99%)
TREET 24.60 Increased By ▲ 0.07 (0.29%)
TRG 69.60 Decreased By ▼ -0.11 (-0.16%)
WAVES 9.94 No Change ▼ 0.00 (0%)
WTL 1.29 Increased By ▲ 0.01 (0.78%)

LAHORE: Under a special recovery campaign, the Lahore Electric Supply Company (LESCO) has accelerated joint operations across various subdivisions, removing several electricity meters during targeted enforcement actions, and registering cases against the responsible persons.

According to LESCO authorities, strict inspections were carried out in the Wahga Subdivision, including the Taqi Pura Feeder, Bhaini, and Paddey villages, as part of the anti-theft drive. As a result, 12 meters were removed, and approximately 2,000 meters of illegal direct supply cable were confiscated. Further legal proceedings have been initiated in accordance with the law.

In a separate operation in Bhano Chak, a tube well installed at Dera (residence/farm) of a man identified as Anwar was found running on a direct illegal connection. The unauthorized supply was disconnected on the spot, and the meter, cable, and 11kV jumper were taken into custody. A formal case has been registered at the relevant police station, and a detection bill has been issued as per rules, the authorities said.

Meanwhile, the Shalimar Subdivision launched a recovery drive against defaulters in DHA where several domestic connections were disconnected over heavy outstanding dues. During the operation, a total of PKR 500,000 was recovered on the spot from two major defaulters, although millions of rupees in outstanding payments remain pending. Further recovery actions are underway.

Copyright Business Recorder, 2026

Comments

200 characters remaining