BR100 Increased By (0.76%)
BR30 Increased By (1.01%)
KSE100 Increased By (0.87%)
KSE30 Increased By (0.79%)
AGHA 6.07 Increased By ▲ 0.04 (0.66%)
BECO 3.85 Decreased By ▼ -0.01 (-0.26%)
BML 60.65 Decreased By ▼ -0.35 (-0.57%)
BOP 28.32 Increased By ▲ 0.23 (0.82%)
CNERGY 11.92 Increased By ▲ 0.18 (1.53%)
CSIL 5.36 Increased By ▲ 0.06 (1.13%)
FCCL 55.88 Increased By ▲ 1.42 (2.61%)
FFL 13.08 Increased By ▲ 0.01 (0.08%)
FNEL 1.16 Increased By ▲ 0.05 (4.5%)
KEL 5.75 Increased By ▲ 0.12 (2.13%)
KOSM 5.37 Increased By ▲ 0.03 (0.56%)
LOTCHEM 23.92 Increased By ▲ 0.09 (0.38%)
MLCF 94.29 Increased By ▲ 1.31 (1.41%)
NBP 165.81 Increased By ▲ 2.61 (1.6%)
NCPL 48.80 Increased By ▲ 0.53 (1.1%)
NPL 50.11 Increased By ▲ 0.40 (0.8%)
OGDC 305.20 Increased By ▲ 1.57 (0.52%)
PACE 9.14 Increased By ▲ 0.17 (1.9%)
PAEL 32.33 Increased By ▲ 0.42 (1.32%)
PIBTL 13.10 Increased By ▲ 0.36 (2.83%)
PPL 214.00 Increased By ▲ 1.09 (0.51%)
PRL 85.25 Increased By ▲ 0.91 (1.08%)
PTC 45.49 Increased By ▲ 0.50 (1.11%)
SSGC 22.98 Increased By ▲ 0.15 (0.66%)
TBL 8.95 Increased By ▲ 0.07 (0.79%)
TELE 6.50 No Change ▼ 0.00 (0%)
TPL 24.82 Increased By ▲ 0.56 (2.31%)
TPLP 12.49 Increased By ▲ 0.50 (4.17%)
TREET 23.24 Increased By ▲ 0.10 (0.43%)
TRG 52.00 Increased By ▲ 0.53 (1.03%)

ISLAMABAD: Oil and Gas Development Company Limited (OGDC), leading exploration and production company on Thursday announced a gas and condensate discovery at its Dars West-3 well located in the Tando Allah Yar district of Sindh.

The new development well was successfully tested in the C-Sands of the Lower Goru Formation. The well was drilled to a total depth of 2,100 metres and tested using OGDC’s in-house technical expertise.

During testing, Dars West-3 flowed at a rate of 9.70 million standard cubic feet per day (MMSCFD) of gas along with 580 barrels per day (BPD) of condensate at a choke size of 36/64 inches. The wellhead flowing pressure was recorded at 1,725 psi from the Lower Goru C-Sand reservoir.

The encouraging results further confirm the hydrocarbon potential of the Lower Goru Formation in the Dars West area and strengthen OGDC’s resource base. It also reflects the company’s continued focus on aggressive exploration, effective reservoir evaluation, and timely development of indigenous energy resources.

Pipeline laying is currently underway to connect the well to the KPD-TAY processing plant. Upon completion, the produced gas will be processed and injected into the SSGCL network, contributing to the national energy supply. The Dars West Development and Production Lease (D&PL) Joint Venture comprises OGDC as operator with a 77.5 percent working interest, while GHPL holds the remaining 22.5 percent.

Copyright Business Recorder, 2026

Comments

Comments are closed for this article.