BR100 Increased By (0.9%)
BR30 Increased By (1.24%)
KSE100 Increased By (1.03%)
KSE30 Increased By (1.22%)
AGHA 6.55 Increased By ▲ 0.23 (3.64%)
BECO 4.40 Increased By ▲ 0.13 (3.04%)
BML 62.45 No Change ▼ 0.00 (0%)
BOP 31.45 Increased By ▲ 0.22 (0.7%)
CNERGY 11.78 Increased By ▲ 0.19 (1.64%)
CSIL 5.94 Increased By ▲ 0.22 (3.85%)
FCCL 61.34 Decreased By ▼ -0.20 (-0.32%)
FFL 14.84 Decreased By ▼ -0.18 (-1.2%)
FNEL 1.25 Increased By ▲ 0.02 (1.63%)
KEL 6.29 Increased By ▲ 0.03 (0.48%)
KOSM 6.02 Increased By ▲ 0.46 (8.27%)
LOTCHEM 24.85 Increased By ▲ 0.17 (0.69%)
MLCF 104.25 Increased By ▲ 0.17 (0.16%)
NBP 174.82 Decreased By ▼ -0.46 (-0.26%)
NCPL 52.90 Increased By ▲ 0.13 (0.25%)
NPL 54.60 Increased By ▲ 0.48 (0.89%)
OGDC 318.80 Increased By ▲ 5.41 (1.73%)
PACE 9.46 Increased By ▲ 0.26 (2.83%)
PAEL 35.75 Decreased By ▼ -0.05 (-0.14%)
PIBTL 13.99 Increased By ▲ 0.52 (3.86%)
PPL 228.50 Increased By ▲ 6.69 (3.02%)
PRL 80.94 Increased By ▲ 1.86 (2.35%)
PTC 47.05 Increased By ▲ 0.20 (0.43%)
SSGC 24.10 Increased By ▲ 0.23 (0.96%)
TBL 9.30 Decreased By ▼ -0.01 (-0.11%)
TELE 7.55 Increased By ▲ 0.16 (2.17%)
TPL 24.85 Decreased By ▼ -0.26 (-1.04%)
TPLP 12.93 Increased By ▲ 0.42 (3.36%)
TREET 26.10 Decreased By ▼ -0.15 (-0.57%)
TRG 53.90 Increased By ▲ 0.46 (0.86%)

KARACHI: Karachi Mayor Barrister Murtaza Wahab, on Monday, said that the rescue operation at the Gul Plaza Shopping Mall has been completed and the site has been sealed.

On the directives of the Chief Minister Sindh, an inquiry committee was formed under the chairmanship of the Commissioner Karachi, Syed Hassan Naqvi. The investigation report will be made public soon. FIR of the incident has already been registered, stated the Mayor during a media briefing at the Head Office of Karachi Water and Sewerage Corporation.

He announced that the Karachi Metropolitan Corporation would carry out road rehabilitation across the megacity at the cost of Rs 46 billion. He said that he visited the Hub Reservoir Tuesday, along with a group of journalists, where cleaning of the 15 MGD tanks at the reservoir was under way after forty years.

The Mayor said that after the recent rains, Hub Dam had been completely filled. A new canal had been constructed at Hub Dam and old canal was also being strengthened. He stated that Hub Dam had sufficient capacity to supply water to the megacity, with 100 MGD over the next three years. After the complete rehabilitation of the old canal, water supply of up to 200 MGD would be possible.

He said that discussions were initiated with the federal government for increasing the water supply by 100 MGD. However, once the additional water supply started, the lack of reservoir capacity emerged as a new challenge. At present, there are two reservoirs of 7.5 MGD each, through which 15 MGD of water will be supplied to the West and Keamari districts.

The Mayor said that steps had also been taken for the repair and rehabilitation of the LSR pumping station, which would help provide an additional 4 to 4.5 MGD of water to the megacity.

Copyright Business Recorder, 2026

Comments

Comments are closed for this article.