BR100 Increased By (0.36%)
BR30 Decreased By (-0.13%)
KSE100 Increased By (0.22%)
KSE30 Increased By (0.37%)
AGHA 6.68 Increased By ▲ 0.01 (0.15%)
BECO 4.37 No Change ▼ 0.00 (0%)
BML 57.32 Increased By ▲ 0.88 (1.56%)
BOP 30.35 Increased By ▲ 0.01 (0.03%)
CNERGY 13.12 Increased By ▲ 0.03 (0.23%)
CSIL 5.41 Increased By ▲ 0.05 (0.93%)
FCCL 52.79 Increased By ▲ 0.41 (0.78%)
FFL 14.72 Decreased By ▼ -0.02 (-0.14%)
FNEL 1.12 No Change ▼ 0.00 (0%)
KEL 6.09 No Change ▼ 0.00 (0%)
KOSM 5.73 Increased By ▲ 0.77 (15.52%)
LOTCHEM 26.46 Decreased By ▼ -0.89 (-3.25%)
MLCF 93.16 Increased By ▲ 0.41 (0.44%)
NBP 164.66 Decreased By ▼ -0.32 (-0.19%)
NCPL 55.66 Increased By ▲ 0.02 (0.04%)
NPL 61.16 Decreased By ▼ -0.10 (-0.16%)
OGDC 316.73 Decreased By ▼ -1.03 (-0.32%)
PACE 9.87 Decreased By ▼ -0.06 (-0.6%)
PAEL 35.63 Increased By ▲ 0.13 (0.37%)
PIBTL 14.68 Increased By ▲ 0.11 (0.75%)
PPL 226.91 Decreased By ▼ -0.88 (-0.39%)
PRL 93.02 Increased By ▲ 0.45 (0.49%)
PTC 60.26 Decreased By ▼ -0.37 (-0.61%)
SSGC 23.81 Increased By ▲ 0.01 (0.04%)
TBL 8.75 Increased By ▲ 0.07 (0.81%)
TELE 7.80 Increased By ▲ 0.02 (0.26%)
TPL 22.35 Increased By ▲ 0.12 (0.54%)
TPLP 12.97 Increased By ▲ 0.30 (2.37%)
TREET 22.16 Decreased By ▼ -0.38 (-1.69%)
TRG 56.56 Decreased By ▼ -1.24 (-2.15%)

ISLAMABAD: The Capital Development Authority (CDA) has begun formal consultations with the French Development Agency (AFD) to launch large-scale reforms in Islamabad’s water sector, including modernisation of the Islamabad Water Agency, rehabilitation of key infrastructure, and the introduction of a citywide water-metering system.

The initiative marks a major step toward sustainable water management and improved service delivery in the federal capital.

Chairman CDA and Chief Commissioner Islamabad, Muhammad Ali Randhawa, held a detailed meeting with the AFD delegation at CDA Headquarters on Friday.

Both sides reviewed potential avenues for institutional capacity building, technical assistance, and modernization of Islamabad’s water infrastructure. Randhawa emphasised that CDA is prioritizing sustainable and technologically advanced solutions to ensure uninterrupted access to clean and safe drinking water for residents.

He said that the Islamabad Water Agency is being strengthened through improved HR systems, advanced equipment, and digital reforms aimed at reducing water wastage, eliminating line losses, and promoting conservation across the city.

Officials briefed the delegation that the first phase of reforms will focus on modernizing the agency’s institutional framework, enhancing revenue mechanisms, and digitizing operations. Rehabilitation of Simly Dam water treatment plants, transmission mains, and service reservoirs is also planned.

The meeting further discussed the implementation of a comprehensive water-metering system to improve monitoring, billing, and efficient consumption.

The AFD delegation assured CDA that a feasibility study will soon be launched to assess the technical and financial requirements of the proposed water projects. Both sides reaffirmed their commitment to leveraging AFD’s expertise to advance Islamabad’s long-term water sustainability goals.

Copyright Business Recorder, 2025

Comments

Comments are closed for this article.