BR100 Increased By (0.01%)
BR30 Increased By (0.53%)
KSE100 Increased By (0.28%)
KSE30 Increased By (0.29%)
AGHA 6.38 Increased By ▲ 0.06 (0.95%)
BECO 4.35 Increased By ▲ 0.08 (1.87%)
BML 62.55 Increased By ▲ 0.10 (0.16%)
BOP 31.39 Increased By ▲ 0.16 (0.51%)
CNERGY 11.73 Increased By ▲ 0.14 (1.21%)
CSIL 5.91 Increased By ▲ 0.19 (3.32%)
FCCL 61.71 Increased By ▲ 0.17 (0.28%)
FFL 14.79 Decreased By ▼ -0.23 (-1.53%)
FNEL 1.24 Increased By ▲ 0.01 (0.81%)
KEL 6.32 Increased By ▲ 0.06 (0.96%)
KOSM 5.90 Increased By ▲ 0.34 (6.12%)
LOTCHEM 24.69 Increased By ▲ 0.01 (0.04%)
MLCF 103.93 Decreased By ▼ -0.15 (-0.14%)
NBP 173.32 Decreased By ▼ -1.96 (-1.12%)
NCPL 51.83 Decreased By ▼ -0.94 (-1.78%)
NPL 54.03 Decreased By ▼ -0.09 (-0.17%)
OGDC 315.87 Increased By ▲ 2.48 (0.79%)
PACE 9.26 Increased By ▲ 0.06 (0.65%)
PAEL 35.58 Decreased By ▼ -0.22 (-0.61%)
PIBTL 13.66 Increased By ▲ 0.19 (1.41%)
PPL 226.07 Increased By ▲ 4.26 (1.92%)
PRL 80.28 Increased By ▲ 1.20 (1.52%)
PTC 46.64 Decreased By ▼ -0.21 (-0.45%)
SSGC 23.82 Decreased By ▼ -0.05 (-0.21%)
TBL 9.24 Decreased By ▼ -0.07 (-0.75%)
TELE 7.55 Increased By ▲ 0.16 (2.17%)
TPL 24.54 Decreased By ▼ -0.57 (-2.27%)
TPLP 12.99 Increased By ▲ 0.48 (3.84%)
TREET 25.98 Decreased By ▼ -0.27 (-1.03%)
TRG 53.33 Decreased By ▼ -0.11 (-0.21%)
By

KARACHI: Sindh Chief Minister Syed Murad Ali Shah, without protocol, conducted a surprise morning inspection of the Malir Expressway’s 9-km stretch between the Jam Sadiq Bridge and the Shah Faisal Interchange, ordering completion by the end of December so that it could be open for traffic.

Addressing the Karachi Commissioner, DIG Police and DMC representatives, he sternly warned regarding encroachments.

“The project must be finished by December 30,” Mr Shah said, directing Engineer Khalid Mansoor to expedite construction. He emphasised the importance of removing all illegal structures and parking along the expressway, from the Shah Faisal Interchange to the airport, to ensure smooth traffic flow.

The Malir Expressway, according to Shah, will reduce travel time between the Jam Sadiq Bridge and Jinnah Terminal via the Shah Faisal Interchange to just 15 minutes. He reiterated his commitment to clearing encroachments from Shah Faisal Interchange all the way to Karachi Airport.

This high-speed expressway will be restricted to vehicles only; motorcycles and rickshaws will be prohibited. Security checkpoints will be established to manage heavy traffic and maintain safety, the CM announced.

Highlighting the expressway’s importance as a vital corridor for commuters and cargo transport, linking Shah Faisal, the airport, Shahrah-e-Faisal, and the National Highway [towards Link Road and Thatta], Shah pledged to accelerate work on the remaining section extending from Shah Faisal to Kathore following the inauguration of this first phase.

The Chief Minister concluded by announcing a follow-up night inspection, instructing officials to install and activate road lighting along the entire expressway before his return.

Comments

Comments are closed for this article.