BR100 Increased By (0.36%)
BR30 Decreased By (-0.13%)
KSE100 Increased By (0.22%)
KSE30 Increased By (0.37%)
AGHA 6.68 Increased By ▲ 0.01 (0.15%)
BECO 4.37 No Change ▼ 0.00 (0%)
BML 57.32 Increased By ▲ 0.88 (1.56%)
BOP 30.35 Increased By ▲ 0.01 (0.03%)
CNERGY 13.12 Increased By ▲ 0.03 (0.23%)
CSIL 5.41 Increased By ▲ 0.05 (0.93%)
FCCL 52.79 Increased By ▲ 0.41 (0.78%)
FFL 14.72 Decreased By ▼ -0.02 (-0.14%)
FNEL 1.12 No Change ▼ 0.00 (0%)
KEL 6.09 No Change ▼ 0.00 (0%)
KOSM 5.73 Increased By ▲ 0.77 (15.52%)
LOTCHEM 26.46 Decreased By ▼ -0.89 (-3.25%)
MLCF 93.16 Increased By ▲ 0.41 (0.44%)
NBP 164.66 Decreased By ▼ -0.32 (-0.19%)
NCPL 55.66 Increased By ▲ 0.02 (0.04%)
NPL 61.16 Decreased By ▼ -0.10 (-0.16%)
OGDC 316.73 Decreased By ▼ -1.03 (-0.32%)
PACE 9.87 Decreased By ▼ -0.06 (-0.6%)
PAEL 35.63 Increased By ▲ 0.13 (0.37%)
PIBTL 14.68 Increased By ▲ 0.11 (0.75%)
PPL 226.91 Decreased By ▼ -0.88 (-0.39%)
PRL 93.02 Increased By ▲ 0.45 (0.49%)
PTC 60.26 Decreased By ▼ -0.37 (-0.61%)
SSGC 23.81 Increased By ▲ 0.01 (0.04%)
TBL 8.75 Increased By ▲ 0.07 (0.81%)
TELE 7.80 Increased By ▲ 0.02 (0.26%)
TPL 22.35 Increased By ▲ 0.12 (0.54%)
TPLP 12.97 Increased By ▲ 0.30 (2.37%)
TREET 22.16 Decreased By ▼ -0.38 (-1.69%)
TRG 56.56 Decreased By ▼ -1.24 (-2.15%)
BR Research

Localization of energy supply chain

Published Updated

With import restrictions, Pakistan's import-substituting manufacturing sectors, which are highly dependent on imports for raw materials, are crippling. And one reason is that the country relied on duty covers to let the domestic sectors spur and was never able to create a level playing field in a true sense.

Enhancement in productivity and innovation in processes is the way to go. In many sectors, Pakistan can do away with local production and could rely on imports (such as an automobile). Still, at the same time, the country needs to step up in some sectors with a competitive edge to not only provide for domestic needs but could also export.

One key area is energy, where competitive pricing and sustained and reliable supply is imperative for many other sectors to be competitive. For example, after recent price revisions, higher energy prices are hitting the country's most prominent exporting sector, the textile sector, badly. And there are many other examples, as many businesses lost their viability at the feasibility stage due to energy pricing and reliability issues.

Here, the critical component is inefficiencies in the transmission and distribution system feeding the circular dent, eventually leading to higher consumer prices. And with curbs on imports, the supply of materials and equipment, which are essential for lowering the T&D losses and streamlining the supply, is hindered too. That is further exacerbating the problem.

In a recent conference, an expert mentioned that Rs470 billion of imported equipment and material has localization potential. This ranges from printed circuit boards to safety harnesses, which must be tapped to improve the energy supply chain. There are incidences where local manufacturing is entering the market, albeit on a limited scale, but it still shows the possibility.

Capturing this potential may be difficult in the current economic conditions, but this is where business groups can play a crucial role in shaping the policies that can channel capital in a targeted manner to spur activity at a grassroots level. These are long-term visions that require stability and clarity to thrive. However, if successful, they can bolster Pakistan's export potential and make the country self-sufficient.

Distribution companies share their long-term multi-year investment plans, which the regulator approves. This money has to come in to maintain or improve service levels. For example, MEPCO plans to invest Rs 149 billion from FY22 to FY26. KE is currently awaiting approval on the Rs 484 billion plan until FY30.

There are tangible performance improvement targets committed against these investments and active scrutiny on whether the projected funds are deployed. Barring variations in response to external macro factors, these provide a clear horizon.

Future sustainability rests on our ability to create resilient supply chains, foster local growth, and break barriers to collaboration. First, of course, governance frameworks will have to be improved - the task seems futile in the current scenario. But when many are working on addressing or worrying over the immediate issues, we must keep our eyes on the future. Otherwise, we run the risk of being caught in a myopic cycle.

Comments

Comments are closed for this article.

Haq Apr 10, 2023 11:37am
Since mid 90s IPPs were introduced with int'l Arbitration agreements, including capacity payments & in US Dollars. This bankrupt WAPDA & started menace of Circular Debt. At present utilities (electricity, gas) cost, taxes & govt policies reached to a level, where local manufacturing cost is so high, that industry CAN'T be feasible to produce locally. Nationalization (by Bhutto), corruption, political interference & WTO compliance completely destroyed our industrial base, including refineries, steel mill, mining, textile, agriculture
0
Tulukan Mairandi Apr 10, 2023 11:50am
It can never be competitive and localized as factories and firms are shutting down. Iron Brother China is replacing the void with cheap Chinese services and goods, shipped in via game changer CPEC. Pakistan cannot diversify its sources until iron brother China's debt is cleared (and it never will be). Pakistan's deeper than oceans relationship with iron brother China is basically pulling Pakistan deeper into the abyss.
0
Muhammad Ali Apr 11, 2023 10:51am
IPPs SPAs done with commissions have broken the backbone of our economy. No plan can undo it except recovery of national loss from fake politicians & bureaucracy who were directly responsible for it. Must mention about Indian role who was successful in blocking building of dams which uprooted our economy. We are on road to total destruction which have no U-Turn or exit as the rotten lot is still here who have been part of problem.
0