AIRLINK 72.59 Increased By ▲ 3.39 (4.9%)
BOP 4.99 Increased By ▲ 0.09 (1.84%)
CNERGY 4.29 Increased By ▲ 0.03 (0.7%)
DFML 31.71 Increased By ▲ 0.46 (1.47%)
DGKC 80.90 Increased By ▲ 3.65 (4.72%)
FCCL 21.42 Increased By ▲ 1.42 (7.1%)
FFBL 35.19 Increased By ▲ 0.19 (0.54%)
FFL 9.33 Increased By ▲ 0.21 (2.3%)
GGL 9.82 Increased By ▲ 0.02 (0.2%)
HBL 112.40 Decreased By ▼ -0.36 (-0.32%)
HUBC 136.50 Increased By ▲ 3.46 (2.6%)
HUMNL 7.14 Increased By ▲ 0.19 (2.73%)
KEL 4.35 Increased By ▲ 0.12 (2.84%)
KOSM 4.35 Increased By ▲ 0.10 (2.35%)
MLCF 37.67 Increased By ▲ 1.07 (2.92%)
OGDC 137.75 Increased By ▲ 4.88 (3.67%)
PAEL 23.41 Increased By ▲ 0.77 (3.4%)
PIAA 24.55 Increased By ▲ 0.35 (1.45%)
PIBTL 6.63 Increased By ▲ 0.17 (2.63%)
PPL 125.05 Increased By ▲ 8.75 (7.52%)
PRL 26.99 Increased By ▲ 1.09 (4.21%)
PTC 13.32 Increased By ▲ 0.24 (1.83%)
SEARL 52.70 Increased By ▲ 0.70 (1.35%)
SNGP 70.80 Increased By ▲ 3.20 (4.73%)
SSGC 10.54 No Change ▼ 0.00 (0%)
TELE 8.33 Increased By ▲ 0.05 (0.6%)
TPLP 10.95 Increased By ▲ 0.15 (1.39%)
TRG 60.60 Increased By ▲ 1.31 (2.21%)
UNITY 25.10 Decreased By ▼ -0.03 (-0.12%)
WTL 1.28 Increased By ▲ 0.01 (0.79%)
BR100 7,566 Increased By 157.7 (2.13%)
BR30 24,786 Increased By 749.4 (3.12%)
KSE100 71,902 Increased By 1235.2 (1.75%)
KSE30 23,595 Increased By 371 (1.6%)

KARACHI: K-Electric has filed its investment plan FY 2024-2030 for Transmission and Distribution segments. The futuristic plan keeps its customers at the heart of the business and seeks to leverage technology as a mainstay to further improve network reliability for smooth and reliable supply of power, while accelerating Karachi’s development, progress, and sustainability.

The new plan envisages to invest Rs484 billion in the Transmission and Distribution business with a keen eye on projected growth in power demand, loss reduction initiatives, targeted and technology driven investments in the network for improved reliability and safety, as well as initiatives to enable KE off-take additional power from external sources including the National Grid.

The goal at the end is to make power affordable, safe, reliable, and smooth. At the same time, it seeks to invest in climate resilient and environmentally sustainable infrastructure for power supply.

Since privatization, KE has halved its T&D losses, doubled its customer base and power consumption. This was possible due to sustained investments totalling to Rs474 billion across the value chain.

As per NEPRA State of Industry Report, since its privatization in 2005, KE is the most improved distribution company in terms of loss reduction.

The new investment plan is designed to further the operational improvements and is aligned with KE’s vision to keep the customer’s interests and needs at the core of the company’s business operations. The previous MYT was an integrated model that together clubbed generation, transmission, and distribution as an integrated model. As the market transforms into an open ecosystem, we look forward to working in this environment to bring the best of our services for our customers.

Copyright Business Recorder, 2023

Comments

Comments are closed.