AIRLINK 72.59 Increased By ▲ 3.39 (4.9%)
BOP 4.99 Increased By ▲ 0.09 (1.84%)
CNERGY 4.29 Increased By ▲ 0.03 (0.7%)
DFML 31.71 Increased By ▲ 0.46 (1.47%)
DGKC 80.90 Increased By ▲ 3.65 (4.72%)
FCCL 21.42 Increased By ▲ 1.42 (7.1%)
FFBL 35.19 Increased By ▲ 0.19 (0.54%)
FFL 9.33 Increased By ▲ 0.21 (2.3%)
GGL 9.82 Increased By ▲ 0.02 (0.2%)
HBL 112.40 Decreased By ▼ -0.36 (-0.32%)
HUBC 136.50 Increased By ▲ 3.46 (2.6%)
HUMNL 7.14 Increased By ▲ 0.19 (2.73%)
KEL 4.35 Increased By ▲ 0.12 (2.84%)
KOSM 4.35 Increased By ▲ 0.10 (2.35%)
MLCF 37.67 Increased By ▲ 1.07 (2.92%)
OGDC 137.75 Increased By ▲ 4.88 (3.67%)
PAEL 23.41 Increased By ▲ 0.77 (3.4%)
PIAA 24.55 Increased By ▲ 0.35 (1.45%)
PIBTL 6.63 Increased By ▲ 0.17 (2.63%)
PPL 125.05 Increased By ▲ 8.75 (7.52%)
PRL 26.99 Increased By ▲ 1.09 (4.21%)
PTC 13.32 Increased By ▲ 0.24 (1.83%)
SEARL 52.70 Increased By ▲ 0.70 (1.35%)
SNGP 70.80 Increased By ▲ 3.20 (4.73%)
SSGC 10.54 No Change ▼ 0.00 (0%)
TELE 8.33 Increased By ▲ 0.05 (0.6%)
TPLP 10.95 Increased By ▲ 0.15 (1.39%)
TRG 60.60 Increased By ▲ 1.31 (2.21%)
UNITY 25.10 Decreased By ▼ -0.03 (-0.12%)
WTL 1.28 Increased By ▲ 0.01 (0.79%)
BR100 7,566 Increased By 157.7 (2.13%)
BR30 24,786 Increased By 749.4 (3.12%)
KSE100 71,902 Increased By 1235.2 (1.75%)
KSE30 23,595 Increased By 371 (1.6%)

ISLAMABAD: Pakistan Railways would receive first batch of 50 new coaches from China in December to upgrade current rolling stock and provide modern facilities to the passengers.

“Out of total 230 coaches around 50 will be provided as completely built units and the remaining 184 to be manufactured in the county by the department’s engineers and technical staff under the supervision of the Chinese experts,” an official told APP.

He said the coaches would have the capacity to run at the train’s speed of 160 kilometers per hour and the teams of Pakistan Railways were in China for the inspection of the prototypes of the coaches as well as the modern high-capacity wagons.

The official said the experts of China were also proving training to the technical staff of Pakistan Railways on manufacturing of such rolling stock.

He said Pakistan Railway was planning to upgrade the dilapidated track as the Khanpur-Kotri section was not fit for high-speed train operation while most of the Main Line-I (ML-I) parts were fit for the 120km per hour train operation.

“After the completion of the ML-I project under the China-Pakistan Economic Corridor (CPEC), the entire ML-1 track would have the capacity to bear the rolling stock operations at the speed of 160km per hour,” he added.

He said that under another similar nature contract, a Chinese company would manufacture 800 freight wagons and 20 brake wagons. The manufacturing of 184 coaches in Pakistan would be under the ‘Transfer of Technology’ project. For the coaches planned to be manufactured in Pakistan – Pakistan Railways Carriage Factory, Islamabad - the Chinese firm would provide spare parts and raw materials.

The official said the teams of Pakistan Railways had left for China mid of August consisting of 18 officials for design inspections, 20 for other inspections and the others for participating in the training related to the transfer of technology.

Comments

Comments are closed.