BR100 Increased By (0.01%)
BR30 Increased By (0.53%)
KSE100 Increased By (0.28%)
KSE30 Increased By (0.29%)
AGHA 6.38 Increased By ▲ 0.06 (0.95%)
BECO 4.35 Increased By ▲ 0.08 (1.87%)
BML 62.55 Increased By ▲ 0.10 (0.16%)
BOP 31.39 Increased By ▲ 0.16 (0.51%)
CNERGY 11.73 Increased By ▲ 0.14 (1.21%)
CSIL 5.91 Increased By ▲ 0.19 (3.32%)
FCCL 61.71 Increased By ▲ 0.17 (0.28%)
FFL 14.79 Decreased By ▼ -0.23 (-1.53%)
FNEL 1.24 Increased By ▲ 0.01 (0.81%)
KEL 6.32 Increased By ▲ 0.06 (0.96%)
KOSM 5.90 Increased By ▲ 0.34 (6.12%)
LOTCHEM 24.69 Increased By ▲ 0.01 (0.04%)
MLCF 103.93 Decreased By ▼ -0.15 (-0.14%)
NBP 173.32 Decreased By ▼ -1.96 (-1.12%)
NCPL 51.83 Decreased By ▼ -0.94 (-1.78%)
NPL 54.03 Decreased By ▼ -0.09 (-0.17%)
OGDC 315.87 Increased By ▲ 2.48 (0.79%)
PACE 9.26 Increased By ▲ 0.06 (0.65%)
PAEL 35.58 Decreased By ▼ -0.22 (-0.61%)
PIBTL 13.66 Increased By ▲ 0.19 (1.41%)
PPL 226.07 Increased By ▲ 4.26 (1.92%)
PRL 80.28 Increased By ▲ 1.20 (1.52%)
PTC 46.64 Decreased By ▼ -0.21 (-0.45%)
SSGC 23.82 Decreased By ▼ -0.05 (-0.21%)
TBL 9.24 Decreased By ▼ -0.07 (-0.75%)
TELE 7.55 Increased By ▲ 0.16 (2.17%)
TPL 24.54 Decreased By ▼ -0.57 (-2.27%)
TPLP 12.99 Increased By ▲ 0.48 (3.84%)
TREET 25.98 Decreased By ▼ -0.27 (-1.03%)
TRG 53.33 Decreased By ▼ -0.11 (-0.21%)

LAHORE: Chief Executive Officer Central Business District Punjab Imran Amin chaired a high-level meeting to review the quality standards, finishing works and safety arrangements of ongoing projects of the Punjab Central Business District Development Authority (PCBDDA). The session focused on ensuring that all developments are being executed in accordance with international construction benchmarks and workplace safety protocols.

Executive Director Technical Riaz Hussain briefed CEO CBD Punjab Imran Amin and COO Brigadier Mansoor Janjua (retd) on the quality of construction materials being used at various project sites. A detailed presentation was also given on the finishing progress of CBD Punjab’s flagship project “Vertex,” where tile installation and elevation works are advancing at a rapid pace.

The CEO CBD Punjab Imran Amin expressed satisfaction over the pace and standard of finishing and directed that the same momentum be maintained across all components. During the meeting, special emphasis was placed on site safety measures. CEO CBD Punjab Imran Amin directed that all construction material must be stored in a secure manner and those excavation areas; particularly those related to sewerage works, must be properly barricaded and clearly marked to prevent any untoward incident. He stressed the need for strict compliance with health and safety regulations at every project location.

Addressing the participants, CEO CBD Punjab Imran Amin stated that while CBD Punjab is moving forward at a fast pace toward urban development, the protection of citizens and workers remains the foremost priority. He reiterated that no negligence regarding site safety would be tolerated and that contractors must always ensure a safe working environment.

The meeting concluded with directions to further strengthen monitoring mechanisms to deliver high-quality, sustainable and people-centric infrastructure across CBD Punjab projects.

Copyright Business Recorder, 2026

Comments

Comments are closed for this article.