BR100 Decreased By (-0.9%)
BR30 Decreased By (-1.08%)
KSE100 Decreased By (-0.81%)
KSE30 Decreased By (-0.88%)
BECO 5.54 Increased By ▲ 0.01 (0.18%)
BML 57.09 Decreased By ▼ -0.86 (-1.48%)
BOP 35.21 Increased By ▲ 0.01 (0.03%)
CNERGY 8.20 Decreased By ▼ -0.02 (-0.24%)
DCL 11.64 No Change ▼ 0.00 (0%)
FCCL 56.49 Decreased By ▼ -0.41 (-0.72%)
FCSC 5.32 Decreased By ▼ -0.07 (-1.3%)
FFL 18.06 Decreased By ▼ -0.07 (-0.39%)
FNEL 1.29 Decreased By ▼ -0.02 (-1.53%)
HUMNL 11.19 Increased By ▲ 0.01 (0.09%)
KEL 8.20 Increased By ▲ 0.05 (0.61%)
KOSM 6.67 Decreased By ▼ -0.29 (-4.17%)
MLCF 100.76 Increased By ▲ 0.24 (0.24%)
NBP 203.00 Decreased By ▼ -0.51 (-0.25%)
PACE 11.49 Increased By ▲ 0.28 (2.5%)
PAEL 43.08 Increased By ▲ 0.33 (0.77%)
PIAHCLA 27.00 Increased By ▲ 0.69 (2.62%)
PIBTL 17.84 Decreased By ▼ -0.10 (-0.56%)
PPL 242.63 Increased By ▲ 0.69 (0.29%)
PRL 35.87 Decreased By ▼ -0.10 (-0.28%)
PTC 65.85 Increased By ▲ 0.27 (0.41%)
SEARL 93.58 Decreased By ▼ -0.82 (-0.87%)
SSGC 32.23 Increased By ▲ 0.91 (2.91%)
TELE 9.11 Increased By ▲ 0.04 (0.44%)
THCCL 66.49 Decreased By ▼ -1.13 (-1.67%)
TPLP 10.95 Increased By ▲ 0.71 (6.93%)
TREET 25.72 Decreased By ▼ -0.12 (-0.46%)
TRG 65.95 Decreased By ▼ -0.73 (-1.09%)
WAVES 11.16 Increased By ▲ 0.11 (1%)
WTL 1.26 Decreased By ▼ -0.03 (-2.33%)

KARACHI: A major power breakdown at Dhabeji on Sunday once again disrupted Karachi’s water lifeline, shutting four pumps and causing an estimated 100-million-gallon shortfall in the city’s supply.

According to a Karachi Water and Sewerage Corporation (KW&SC) spokesperson, the latest outage by K Electric struck at 6:35 a.m. in the second phase of the Dhabeji Pumping Station, also damaging a 72-inch diameter main water line. The shutdown forced four pumps offline, cutting a significant portion of the city’s bulk water supply.

Power was restored around 9 a.m., allowing two pumps to resume operations and partially stabilise the distribution system. The remaining two pumps will be reactivated once repairs to the damaged line are completed, officials added.

Acting on the instructions of KW&SC CEO Ahmed Ali Siddiqui, technical teams immediately launched emergency repair work on the affected line. Restoration is expected to be completed by Monday, after which the Dhabeji system is likely to return to full capacity.

The incident is the latest in a series of K-Electric–linked power failures at the pumping station. Earlier breakdowns reported on November 5, 11, and 13 affecting Dhabeji’s Fourth Phase, Second Phase, and K-III pump house also triggered widespread water shortages across Karachi.

Copyright Business Recorder, 2025

Comments

Comments are closed for this article.