BR100 Increased By (2.12%)
BR30 Increased By (2.31%)
KSE100 Increased By (1.96%)
KSE30 Increased By (1.93%)
AGHA 6.18 Increased By ▲ 0.06 (0.98%)
BECO 4.23 Increased By ▲ 0.07 (1.68%)
BML 61.84 Decreased By ▼ -0.89 (-1.42%)
BOP 31.70 Increased By ▲ 0.80 (2.59%)
CNERGY 12.06 Increased By ▲ 0.09 (0.75%)
CSIL 5.63 Increased By ▲ 0.21 (3.87%)
FCCL 58.71 Increased By ▲ 1.93 (3.4%)
FFL 13.47 Increased By ▲ 0.13 (0.97%)
FNEL 1.17 Increased By ▲ 0.02 (1.74%)
KEL 6.14 Increased By ▲ 0.14 (2.33%)
KOSM 5.66 Increased By ▲ 0.18 (3.28%)
LOTCHEM 24.82 Increased By ▲ 0.45 (1.85%)
MLCF 102.09 Increased By ▲ 4.60 (4.72%)
NBP 179.66 Increased By ▲ 5.16 (2.96%)
NCPL 50.05 Increased By ▲ 1.58 (3.26%)
NPL 52.90 Increased By ▲ 2.67 (5.32%)
OGDC 316.24 Increased By ▲ 5.77 (1.86%)
PACE 9.21 Increased By ▲ 0.16 (1.77%)
PAEL 34.02 Increased By ▲ 0.95 (2.87%)
PIBTL 13.42 Increased By ▲ 0.27 (2.05%)
PPL 221.30 Increased By ▲ 4.13 (1.9%)
PRL 84.60 Decreased By ▼ -1.06 (-1.24%)
PTC 48.38 Increased By ▲ 2.19 (4.74%)
SSGC 22.94 Decreased By ▼ -0.38 (-1.63%)
TBL 9.30 Increased By ▲ 0.28 (3.1%)
TELE 7.07 Increased By ▲ 0.34 (5.05%)
TPL 25.86 Decreased By ▼ -0.24 (-0.92%)
TPLP 13.11 Increased By ▲ 0.44 (3.47%)
TREET 24.99 Increased By ▲ 1.19 (5%)
TRG 54.03 Increased By ▲ 0.86 (1.62%)

LAHORE: In compliance with the instructions of Ministry of Energy (Power Division), the National Transmission and Despatch Company Limited (NTDC) has completed all necessary preparations to ensure uninterrupted power supply throughout the country on the occasion of Eid.

A central control room has been set up to maintain close liaison with National Power Control Centre and all distribution companies (Discos) which will work round the clock during Eid-ul-Fitr holidays. Regional control rooms have also been set up in Islamabad, Multan and Hyderabad to deal with any emergency situation. All control rooms will be connected with each other through video link. These control rooms has been working throughout Ramazan.

The teams of Asset Management (North) and (South) have also been constituted for immediate response in case of any fault at NTDC grid stations or transmission lines across the country. The concerned officers will remain present at the grid stations all the time during Eid-ul-Fitr holidays.

Managing Director NTDC, Engr Dr Rana Abdul Jabbar Khan has directed the concerned NTDC formations to remain vigilant to ensure smooth power supply throughout the country on the occasion of Eid-ul-Fitr.

Copyright Business Recorder, 2024

Comments

Comments are closed for this article.