BR100 Increased By (0.01%)
BR30 Increased By (0.53%)
KSE100 Increased By (0.28%)
KSE30 Increased By (0.29%)
AGHA 6.38 Increased By ▲ 0.06 (0.95%)
BECO 4.35 Increased By ▲ 0.08 (1.87%)
BML 62.55 Increased By ▲ 0.10 (0.16%)
BOP 31.39 Increased By ▲ 0.16 (0.51%)
CNERGY 11.73 Increased By ▲ 0.14 (1.21%)
CSIL 5.91 Increased By ▲ 0.19 (3.32%)
FCCL 61.71 Increased By ▲ 0.17 (0.28%)
FFL 14.79 Decreased By ▼ -0.23 (-1.53%)
FNEL 1.24 Increased By ▲ 0.01 (0.81%)
KEL 6.32 Increased By ▲ 0.06 (0.96%)
KOSM 5.90 Increased By ▲ 0.34 (6.12%)
LOTCHEM 24.69 Increased By ▲ 0.01 (0.04%)
MLCF 103.93 Decreased By ▼ -0.15 (-0.14%)
NBP 173.32 Decreased By ▼ -1.96 (-1.12%)
NCPL 51.83 Decreased By ▼ -0.94 (-1.78%)
NPL 54.03 Decreased By ▼ -0.09 (-0.17%)
OGDC 315.87 Increased By ▲ 2.48 (0.79%)
PACE 9.26 Increased By ▲ 0.06 (0.65%)
PAEL 35.58 Decreased By ▼ -0.22 (-0.61%)
PIBTL 13.66 Increased By ▲ 0.19 (1.41%)
PPL 226.07 Increased By ▲ 4.26 (1.92%)
PRL 80.28 Increased By ▲ 1.20 (1.52%)
PTC 46.64 Decreased By ▼ -0.21 (-0.45%)
SSGC 23.82 Decreased By ▼ -0.05 (-0.21%)
TBL 9.24 Decreased By ▼ -0.07 (-0.75%)
TELE 7.55 Increased By ▲ 0.16 (2.17%)
TPL 24.54 Decreased By ▼ -0.57 (-2.27%)
TPLP 12.99 Increased By ▲ 0.48 (3.84%)
TREET 25.98 Decreased By ▼ -0.27 (-1.03%)
TRG 53.33 Decreased By ▼ -0.11 (-0.21%)
By

DUBAI: Three South Korean companies have signed an agreement to build a $1 billion green hydrogen and ammonia production plant in the United Arab Emirates, their UAE partner said on Friday.

Korea Electric Power Corporation, Samsung C&T Corporation and Korea Western Power, alongside the UAE’s Petrolyn Chemie, will build a plant that can produce up to 200,000 tonnes of green ammonia a year, Petrolyn said.

Green hydrogen - obtained by passing renewably-produced electricity through water to split the element from oxygen – has been touted by some as a key fuel for energy users looking to cut greenhouse gas emissions.

Both the UAE and neighbour Saudi Arabia have set out ambitious plans for hydrogen, amid a deepening economic rivalry between them.

The plant will be built in two phases in the KIZAD Industrial Area near the capital Abu Dhabi, with the first phase producing 35,000 tonnes before the second phase takes the project to full scale.

“Participating companies will achieve their respective Net-Zero vision through the Project. They are expected to…expand the drive of future growth in the global green hydrogen market by expanded reproduction of their future business model,” Petrolyn said.

Comments

Comments are closed for this article.