BR100 Increased By (0.01%)
BR30 Increased By (0.53%)
KSE100 Increased By (0.28%)
KSE30 Increased By (0.29%)
AGHA 6.38 Increased By ▲ 0.06 (0.95%)
BECO 4.35 Increased By ▲ 0.08 (1.87%)
BML 62.55 Increased By ▲ 0.10 (0.16%)
BOP 31.39 Increased By ▲ 0.16 (0.51%)
CNERGY 11.73 Increased By ▲ 0.14 (1.21%)
CSIL 5.91 Increased By ▲ 0.19 (3.32%)
FCCL 61.71 Increased By ▲ 0.17 (0.28%)
FFL 14.79 Decreased By ▼ -0.23 (-1.53%)
FNEL 1.24 Increased By ▲ 0.01 (0.81%)
KEL 6.32 Increased By ▲ 0.06 (0.96%)
KOSM 5.90 Increased By ▲ 0.34 (6.12%)
LOTCHEM 24.69 Increased By ▲ 0.01 (0.04%)
MLCF 103.93 Decreased By ▼ -0.15 (-0.14%)
NBP 173.32 Decreased By ▼ -1.96 (-1.12%)
NCPL 51.83 Decreased By ▼ -0.94 (-1.78%)
NPL 54.03 Decreased By ▼ -0.09 (-0.17%)
OGDC 315.87 Increased By ▲ 2.48 (0.79%)
PACE 9.26 Increased By ▲ 0.06 (0.65%)
PAEL 35.58 Decreased By ▼ -0.22 (-0.61%)
PIBTL 13.66 Increased By ▲ 0.19 (1.41%)
PPL 226.07 Increased By ▲ 4.26 (1.92%)
PRL 80.28 Increased By ▲ 1.20 (1.52%)
PTC 46.64 Decreased By ▼ -0.21 (-0.45%)
SSGC 23.82 Decreased By ▼ -0.05 (-0.21%)
TBL 9.24 Decreased By ▼ -0.07 (-0.75%)
TELE 7.55 Increased By ▲ 0.16 (2.17%)
TPL 24.54 Decreased By ▼ -0.57 (-2.27%)
TPLP 12.99 Increased By ▲ 0.48 (3.84%)
TREET 25.98 Decreased By ▼ -0.27 (-1.03%)
TRG 53.33 Decreased By ▼ -0.11 (-0.21%)

KARACHI: Lucky Electric Power Company Limited (LEPCL), a wholly owned subsidiary of Lucky Cement Limited, has completed commissioning of its 660MW super critical, lignite coal-based power plant at Deh Ghangiaro, Bin Qasim, Karachi.

The power plant was synchronised with the national grid towards the end of CY2021 and since then has been involved in extensive testing and completing relevant inspections and commissioning, thereby achieving the Commercial Operations Date (COD) on March 21, 2022, Lucky Cement Limited said this in material information sent to Pakistan Stock Exchange on Monday.

The power plant has been designed to operate on Thar Lignite Coal, subject to its availability, however, during the interim period, it will mainly operate on imported lignite coal till the completion of Phase-III of Sindh Engro Coal Mining Company (SECMC), which is expected in the second quarter of CY 2023, it added.

The addition of 660MW electricity to the national grid will not only play a key role in increasing the energy security and prosperity of Pakistan, but will also go on to reduce the cost of electricity and reliance on imported fuel after completion of Phase-III of SECMC, the information said.

Copyright Business Recorder, 2022

Comments

Comments are closed for this article.