AIRLINK 79.41 Increased By ▲ 1.02 (1.3%)
BOP 5.33 Decreased By ▼ -0.01 (-0.19%)
CNERGY 4.38 Increased By ▲ 0.05 (1.15%)
DFML 33.19 Increased By ▲ 2.32 (7.52%)
DGKC 76.87 Decreased By ▼ -1.64 (-2.09%)
FCCL 20.53 Decreased By ▼ -0.05 (-0.24%)
FFBL 31.40 Decreased By ▼ -0.90 (-2.79%)
FFL 9.85 Decreased By ▼ -0.37 (-3.62%)
GGL 10.25 Decreased By ▼ -0.04 (-0.39%)
HBL 117.93 Decreased By ▼ -0.57 (-0.48%)
HUBC 134.10 Decreased By ▼ -1.00 (-0.74%)
HUMNL 7.00 Increased By ▲ 0.13 (1.89%)
KEL 4.67 Increased By ▲ 0.50 (11.99%)
KOSM 4.74 Increased By ▲ 0.01 (0.21%)
MLCF 37.44 Decreased By ▼ -1.23 (-3.18%)
OGDC 136.70 Increased By ▲ 1.85 (1.37%)
PAEL 23.15 Decreased By ▼ -0.25 (-1.07%)
PIAA 26.55 Decreased By ▼ -0.09 (-0.34%)
PIBTL 7.00 Decreased By ▼ -0.02 (-0.28%)
PPL 113.75 Increased By ▲ 0.30 (0.26%)
PRL 27.52 Decreased By ▼ -0.21 (-0.76%)
PTC 14.75 Increased By ▲ 0.15 (1.03%)
SEARL 57.20 Increased By ▲ 0.70 (1.24%)
SNGP 67.50 Increased By ▲ 1.20 (1.81%)
SSGC 11.09 Increased By ▲ 0.15 (1.37%)
TELE 9.23 Increased By ▲ 0.08 (0.87%)
TPLP 11.56 Decreased By ▼ -0.11 (-0.94%)
TRG 72.10 Increased By ▲ 0.67 (0.94%)
UNITY 24.82 Increased By ▲ 0.31 (1.26%)
WTL 1.40 Increased By ▲ 0.07 (5.26%)
BR100 7,526 Increased By 32.9 (0.44%)
BR30 24,650 Increased By 91.4 (0.37%)
KSE100 71,971 Decreased By -80.5 (-0.11%)
KSE30 23,749 Decreased By -58.8 (-0.25%)
Pakistan

World’s highest airport begins construction under CPEC

The airport, which will be built at the Pamir Plateau at an elevation of 4,500 meters, is part of the China Pakista
Published April 29, 2020
  • The airport, which will be built at the Pamir Plateau at an elevation of 4,500 meters, is part of the China Pakistan Economic Corridor (CPEC).

China has begun the construction of what would be the world's highest airport on completion, at its northwest Xinjiang Uygur Autonomous Region.

The airport, which will be built at the Pamir Plateau at an elevation of 4,500 meters, is part of the China Pakistan Economic Corridor (CPEC) and the Belt and Road Initiative (BRI).

As per Chinese media outlet CGTN, the airport will cost about $230 million, the airport runway will be measuring 3,800 meters long and 45 meters wide, and will have a terminal of 3,000 square meters and an apron with four stands, among other facilities.

The airport will be able to accommodate 160,000 passengers and 400 tons of cargoes annually.

As per building authorities, the airport upon completion is expected to bring a lot more tourists into Pamirs Plateau, noted for its natural beauty and unique Tajik culture, however, it remains inaccessible due to rough terrain.

The airport construction is expected to complete by the first half of 2022.

Comments

Comments are closed.