BR100 Increased By (1.9%)
BR30 Increased By (1.3%)
KSE100 Increased By (1.66%)
KSE30 Increased By (1.87%)
AGHA 7.47 Increased By ▲ 0.02 (0.27%)
BECO 5.30 Increased By ▲ 0.06 (1.15%)
BML 57.15 Increased By ▲ 0.41 (0.72%)
BOP 34.75 Increased By ▲ 1.05 (3.12%)
CNERGY 11.06 Increased By ▲ 0.05 (0.45%)
CSIL 5.89 Increased By ▲ 0.03 (0.51%)
FCCL 56.40 Increased By ▲ 1.26 (2.29%)
FFL 16.47 Increased By ▲ 0.37 (2.3%)
FNEL 1.21 Increased By ▲ 0.01 (0.83%)
KEL 7.36 Increased By ▲ 0.10 (1.38%)
KOSM 6.15 Increased By ▲ 0.14 (2.33%)
LOTCHEM 27.19 Increased By ▲ 0.28 (1.04%)
MLCF 98.25 Increased By ▲ 2.32 (2.42%)
NBP 206.80 Increased By ▲ 3.52 (1.73%)
NCPL 56.50 Increased By ▲ 0.77 (1.38%)
NPL 65.72 Increased By ▲ 0.67 (1.03%)
OGDC 316.45 Increased By ▲ 2.34 (0.74%)
PACE 10.94 Increased By ▲ 0.45 (4.29%)
PAEL 42.44 Increased By ▲ 0.52 (1.24%)
PIBTL 16.82 Increased By ▲ 0.08 (0.48%)
PPL 221.10 Increased By ▲ 3.38 (1.55%)
PRL 63.93 Increased By ▲ 1.23 (1.96%)
PTC 71.65 Increased By ▲ 0.19 (0.27%)
SSGC 27.20 Increased By ▲ 0.46 (1.72%)
TBL 9.75 Increased By ▲ 0.09 (0.93%)
TELE 8.75 Increased By ▲ 0.27 (3.18%)
TPL 19.29 Decreased By ▼ -0.69 (-3.45%)
TPLP 14.80 Decreased By ▼ -0.14 (-0.94%)
TREET 23.40 Increased By ▲ 0.33 (1.43%)
TRG 61.50 Increased By ▲ 0.83 (1.37%)

KARACHI: Twelve-hour power suspension to different areas of Sindh and Balochistan provinces ended on Monday, when the Wapda engineers restored all high transmission lines of the Guddu Thermal Power Station that had gone tripped due to dense smog.

Power supply to some areas of Hyderabad, Larkana, Sukkur, Rahimyar Khan, Jaffarabad and other areas of Sindh and Balochistan was suspended due to the tripping of high-tension cables but after hectic efforts of 12 hours the problem was resolved and 1750mw electricity added to the system.

Copyright PPI (Pakistan Press International), 2017
 

 

 

Comments

Comments are closed for this article.