AIRLINK 80.60 Increased By ▲ 1.19 (1.5%)
BOP 5.26 Decreased By ▼ -0.07 (-1.31%)
CNERGY 4.52 Increased By ▲ 0.14 (3.2%)
DFML 34.50 Increased By ▲ 1.31 (3.95%)
DGKC 78.90 Increased By ▲ 2.03 (2.64%)
FCCL 20.85 Increased By ▲ 0.32 (1.56%)
FFBL 33.78 Increased By ▲ 2.38 (7.58%)
FFL 9.70 Decreased By ▼ -0.15 (-1.52%)
GGL 10.11 Decreased By ▼ -0.14 (-1.37%)
HBL 117.85 Decreased By ▼ -0.08 (-0.07%)
HUBC 137.80 Increased By ▲ 3.70 (2.76%)
HUMNL 7.05 Increased By ▲ 0.05 (0.71%)
KEL 4.59 Decreased By ▼ -0.08 (-1.71%)
KOSM 4.56 Decreased By ▼ -0.18 (-3.8%)
MLCF 37.80 Increased By ▲ 0.36 (0.96%)
OGDC 137.20 Increased By ▲ 0.50 (0.37%)
PAEL 22.80 Decreased By ▼ -0.35 (-1.51%)
PIAA 26.57 Increased By ▲ 0.02 (0.08%)
PIBTL 6.76 Decreased By ▼ -0.24 (-3.43%)
PPL 114.30 Increased By ▲ 0.55 (0.48%)
PRL 27.33 Decreased By ▼ -0.19 (-0.69%)
PTC 14.59 Decreased By ▼ -0.16 (-1.08%)
SEARL 57.00 Decreased By ▼ -0.20 (-0.35%)
SNGP 66.75 Decreased By ▼ -0.75 (-1.11%)
SSGC 11.00 Decreased By ▼ -0.09 (-0.81%)
TELE 9.11 Decreased By ▼ -0.12 (-1.3%)
TPLP 11.46 Decreased By ▼ -0.10 (-0.87%)
TRG 70.23 Decreased By ▼ -1.87 (-2.59%)
UNITY 25.20 Increased By ▲ 0.38 (1.53%)
WTL 1.33 Decreased By ▼ -0.07 (-5%)
BR100 7,626 Increased By 100.3 (1.33%)
BR30 24,814 Increased By 164.5 (0.67%)
KSE100 72,743 Increased By 771.4 (1.07%)
KSE30 24,034 Increased By 284.8 (1.2%)

imageISLAMABAD: Pakistan Railway has finalized a PC-I for procurement of 250 coaches out of which 186 will be manufactured in its Carriage Factory Islamabad (CFI).

The PC-1 has been forwarded to Planning Commission for approval while a tender to procure 800 high capacity hopper wagons was also in progress, out of which 595 wagons will be manufactured at CFI, sources in the Ministry of Railways told APP.

They said that Pakistan Railways annual production capacity of CFI is 120 coaches and during last two years, 225 passenger coaches were produced, rehabilitated and repaired in the factory, of which 132 during 2013-14 and 93 during 2014-15.

Similarly, during previous two years the number productivity was 24 coaches in the year 2011-12 and 40 coaches in 2012-13, they added.

With regard to steps taken by the government to improve efficiency of Railway Carriage Factory, Islamabad, they said un-interrupted arrangement of funds is being made for timely completion of on-going projects.

They said Pakistan Railways has brought a paradigm shift in policy of the procurement of rolling stock, discouraging import as Completely Built Units (CBU) to indigenous manufacturing, added that in future bulk of rolling stock will be manufactured locally in Pakistan Railway's own manufacturing works including CFI.

Copyright APP (Associated Press of Pakistan), 2016

Comments

Comments are closed.