AIRLINK 72.59 Increased By ▲ 3.39 (4.9%)
BOP 4.99 Increased By ▲ 0.09 (1.84%)
CNERGY 4.29 Increased By ▲ 0.03 (0.7%)
DFML 31.71 Increased By ▲ 0.46 (1.47%)
DGKC 80.90 Increased By ▲ 3.65 (4.72%)
FCCL 21.42 Increased By ▲ 1.42 (7.1%)
FFBL 35.19 Increased By ▲ 0.19 (0.54%)
FFL 9.33 Increased By ▲ 0.21 (2.3%)
GGL 9.82 Increased By ▲ 0.02 (0.2%)
HBL 112.40 Decreased By ▼ -0.36 (-0.32%)
HUBC 136.50 Increased By ▲ 3.46 (2.6%)
HUMNL 7.14 Increased By ▲ 0.19 (2.73%)
KEL 4.35 Increased By ▲ 0.12 (2.84%)
KOSM 4.35 Increased By ▲ 0.10 (2.35%)
MLCF 37.67 Increased By ▲ 1.07 (2.92%)
OGDC 137.75 Increased By ▲ 4.88 (3.67%)
PAEL 23.41 Increased By ▲ 0.77 (3.4%)
PIAA 24.55 Increased By ▲ 0.35 (1.45%)
PIBTL 6.63 Increased By ▲ 0.17 (2.63%)
PPL 125.05 Increased By ▲ 8.75 (7.52%)
PRL 26.99 Increased By ▲ 1.09 (4.21%)
PTC 13.32 Increased By ▲ 0.24 (1.83%)
SEARL 52.70 Increased By ▲ 0.70 (1.35%)
SNGP 70.80 Increased By ▲ 3.20 (4.73%)
SSGC 10.54 No Change ▼ 0.00 (0%)
TELE 8.33 Increased By ▲ 0.05 (0.6%)
TPLP 10.95 Increased By ▲ 0.15 (1.39%)
TRG 60.60 Increased By ▲ 1.31 (2.21%)
UNITY 25.10 Decreased By ▼ -0.03 (-0.12%)
WTL 1.28 Increased By ▲ 0.01 (0.79%)
BR100 7,566 Increased By 157.7 (2.13%)
BR30 24,786 Increased By 749.4 (3.12%)
KSE100 71,902 Increased By 1235.2 (1.75%)
KSE30 23,595 Increased By 371 (1.6%)

German-nuclear-plantFRANKFURT: The following table lists outages at German nuclear power plants. It gives dates for previous outages, plants returning online and planned shutdowns.

Nuclear figures are available because operators must notify the public about their status under safety laws.

There are now 2,744 MW offline, or 21.6 percent of the total capacity.

Germany took the axe to the bulk of its nuclear capacity in the summer of 2011, switching off the seven oldest blocks plus Vattenfall's Kruemmel permanently after the Japan nuclear crisis earlier last year raised safety concerns.

German policymakers agreed to leave the 8,821 MW represented by the eight blocks offline when a three-month moratorium, imposed in March, expired at the end of June 2011.

The new installed total number Of 12,696 MW was confirmed by engineering group VGB.

Prior to the Fukushima crisis, the German (gross) nuclear capacity count had amounted to 21,500 MW.

The latest policy plan also reversed longer nuclear life cycles granted to the remaining nuclear power stations in the autumn of 2010 and aims to phase them out by the end of 2022.

Copyright Reuters, 2012

Comments

Comments are closed.