AIRLINK 72.59 Increased By ▲ 3.39 (4.9%)
BOP 4.99 Increased By ▲ 0.09 (1.84%)
CNERGY 4.29 Increased By ▲ 0.03 (0.7%)
DFML 31.71 Increased By ▲ 0.46 (1.47%)
DGKC 80.90 Increased By ▲ 3.65 (4.72%)
FCCL 21.42 Increased By ▲ 1.42 (7.1%)
FFBL 35.19 Increased By ▲ 0.19 (0.54%)
FFL 9.33 Increased By ▲ 0.21 (2.3%)
GGL 9.82 Increased By ▲ 0.02 (0.2%)
HBL 112.40 Decreased By ▼ -0.36 (-0.32%)
HUBC 136.50 Increased By ▲ 3.46 (2.6%)
HUMNL 7.14 Increased By ▲ 0.19 (2.73%)
KEL 4.35 Increased By ▲ 0.12 (2.84%)
KOSM 4.35 Increased By ▲ 0.10 (2.35%)
MLCF 37.67 Increased By ▲ 1.07 (2.92%)
OGDC 137.75 Increased By ▲ 4.88 (3.67%)
PAEL 23.41 Increased By ▲ 0.77 (3.4%)
PIAA 24.55 Increased By ▲ 0.35 (1.45%)
PIBTL 6.63 Increased By ▲ 0.17 (2.63%)
PPL 125.05 Increased By ▲ 8.75 (7.52%)
PRL 26.99 Increased By ▲ 1.09 (4.21%)
PTC 13.32 Increased By ▲ 0.24 (1.83%)
SEARL 52.70 Increased By ▲ 0.70 (1.35%)
SNGP 70.80 Increased By ▲ 3.20 (4.73%)
SSGC 10.54 No Change ▼ 0.00 (0%)
TELE 8.33 Increased By ▲ 0.05 (0.6%)
TPLP 10.95 Increased By ▲ 0.15 (1.39%)
TRG 60.60 Increased By ▲ 1.31 (2.21%)
UNITY 25.10 Decreased By ▼ -0.03 (-0.12%)
WTL 1.28 Increased By ▲ 0.01 (0.79%)
BR100 7,566 Increased By 157.7 (2.13%)
BR30 24,786 Increased By 749.4 (3.12%)
KSE100 71,902 Increased By 1235.2 (1.75%)
KSE30 23,595 Increased By 371 (1.6%)

imagePESHAWAR: Commissioner Hazara Division Muhammad Akbar Khan has said that the completion of Dasu Hydro Power Project will increase the power production to a great extent in Khyber Pakhtunkhwa as well as in the country.

He said Dasu Hydro Power Project would play a pivotal role in the progress and prosperity of the country.

He expressed these views, while addressing a function on the occasion of inking an agreement between Provincial Government and Wapda for acquiring land for Dasu Hydro Power Project. Deputy Commissioner Kohistan and High officials of Wapda were also present on the occasion.

The Commissioner Hazara Division said that the agreement would be helpful in the work of acquisition of land. Dasu Hydro Power Project is a big national project which, if completed as early as possible would increase the power production at district of Kohistan, Khyber Pakhtunkhwa as well as in the whole country.

He said the project would be helpful in moving the province as well as the country ahead on the way of progress.

The Commissioner Hazara Division directed M.D Dasu Hadro Power Project to include the schemes of welfare and development of the poor people of district Kohistan in the project. G.M Daus Hydro Power Project assured the commissioner that the schemes for the development and welfare of the people of district Kohistan have already been included in this project like the schemes of Health, Education and clean drinking water.

Copyright APP (Associated Press of Pakistan), 2016

Comments

Comments are closed.