AIRLINK 72.59 Increased By ▲ 3.39 (4.9%)
BOP 4.99 Increased By ▲ 0.09 (1.84%)
CNERGY 4.29 Increased By ▲ 0.03 (0.7%)
DFML 31.71 Increased By ▲ 0.46 (1.47%)
DGKC 80.90 Increased By ▲ 3.65 (4.72%)
FCCL 21.42 Increased By ▲ 1.42 (7.1%)
FFBL 35.19 Increased By ▲ 0.19 (0.54%)
FFL 9.33 Increased By ▲ 0.21 (2.3%)
GGL 9.82 Increased By ▲ 0.02 (0.2%)
HBL 112.40 Decreased By ▼ -0.36 (-0.32%)
HUBC 136.50 Increased By ▲ 3.46 (2.6%)
HUMNL 7.14 Increased By ▲ 0.19 (2.73%)
KEL 4.35 Increased By ▲ 0.12 (2.84%)
KOSM 4.35 Increased By ▲ 0.10 (2.35%)
MLCF 37.67 Increased By ▲ 1.07 (2.92%)
OGDC 137.75 Increased By ▲ 4.88 (3.67%)
PAEL 23.41 Increased By ▲ 0.77 (3.4%)
PIAA 24.55 Increased By ▲ 0.35 (1.45%)
PIBTL 6.63 Increased By ▲ 0.17 (2.63%)
PPL 125.05 Increased By ▲ 8.75 (7.52%)
PRL 26.99 Increased By ▲ 1.09 (4.21%)
PTC 13.32 Increased By ▲ 0.24 (1.83%)
SEARL 52.70 Increased By ▲ 0.70 (1.35%)
SNGP 70.80 Increased By ▲ 3.20 (4.73%)
SSGC 10.54 No Change ▼ 0.00 (0%)
TELE 8.33 Increased By ▲ 0.05 (0.6%)
TPLP 10.95 Increased By ▲ 0.15 (1.39%)
TRG 60.60 Increased By ▲ 1.31 (2.21%)
UNITY 25.10 Decreased By ▼ -0.03 (-0.12%)
WTL 1.28 Increased By ▲ 0.01 (0.79%)
BR100 7,566 Increased By 157.7 (2.13%)
BR30 24,786 Increased By 749.4 (3.12%)
KSE100 71,902 Increased By 1235.2 (1.75%)
KSE30 23,595 Increased By 371 (1.6%)

imageRECORDER REPORT

KARACHI: A sudden spurt in electricity loadshedding in Pakistan’s largest city, Karachi, is said to have been caused by a significant reduction in gas supply to the utility agency.

According to sources, the Sui Southern Gas Company has reduced gas supply to KESC by 50 mmcfd, resulting in a high incidence of power loadshedding across Karachi.

Sources said that SSGC is required to supply 276 mmcfd gas for all KESC power plants excluding BQPS II. For BQPS II, additional 130 mmcfd gas is mandated through various government bodies at the highest level.

The SSGC has been accused of allocating gas to a few industrialists for their own power generation in alleged violation of Gas Allocation Policy 2005. These private companies get upto 300 mmcfd gas for their power generation; these are accused of using low efficiency plants. However, KESC is getting only 130 mmcfd gas during peak summer time.

Over the last 18 months, KESC is said to have paid SSGC Rs 42 billion against gas purchase of Rs 41 billion.

The gas supply to KESC has been reduced to 130 mmcfd. The utility was getting over 220 mmcfd gas last year at this time.

The SSGC could not be reached for comments.

Comments

Comments are closed.