AIRLINK 75.16 Increased By ▲ 1.46 (1.98%)
BOP 4.93 Increased By ▲ 0.03 (0.61%)
CNERGY 4.44 Decreased By ▼ -0.08 (-1.77%)
DFML 44.02 Decreased By ▼ -0.86 (-1.92%)
DGKC 84.78 Decreased By ▼ -0.72 (-0.84%)
FCCL 21.29 Decreased By ▼ -0.11 (-0.51%)
FFBL 32.56 Increased By ▲ 0.05 (0.15%)
FFL 9.51 Decreased By ▼ -0.08 (-0.83%)
GGL 10.18 Decreased By ▼ -0.09 (-0.88%)
HASCOL 6.99 Decreased By ▼ -0.14 (-1.96%)
HBL 114.52 Decreased By ▼ -0.18 (-0.16%)
HUBC 138.15 Decreased By ▼ -0.95 (-0.68%)
HUMNL 12.20 Decreased By ▼ -0.22 (-1.77%)
KEL 4.97 Decreased By ▼ -0.06 (-1.19%)
KOSM 4.42 Decreased By ▼ -0.03 (-0.67%)
MLCF 37.26 Decreased By ▼ -0.34 (-0.9%)
OGDC 135.71 Decreased By ▼ -1.09 (-0.8%)
PAEL 25.30 Decreased By ▼ -0.09 (-0.35%)
PIBTL 6.60 Decreased By ▼ -0.09 (-1.35%)
PPL 120.00 Decreased By ▼ -1.00 (-0.83%)
PRL 26.46 Decreased By ▼ -0.13 (-0.49%)
PTC 14.00 Decreased By ▼ -0.10 (-0.71%)
SEARL 56.75 Decreased By ▼ -0.55 (-0.96%)
SNGP 67.25 Decreased By ▼ -0.75 (-1.1%)
SSGC 10.34 Decreased By ▼ -0.08 (-0.77%)
TELE 8.37 Decreased By ▼ -0.08 (-0.95%)
TPLP 10.94 Decreased By ▼ -0.04 (-0.36%)
TRG 62.90 Decreased By ▼ -0.44 (-0.69%)
UNITY 26.90 Decreased By ▼ -0.15 (-0.55%)
WTL 1.37 Decreased By ▼ -0.01 (-0.72%)
BR100 7,927 Decreased By -13.4 (-0.17%)
BR30 25,444 Decreased By -203.6 (-0.79%)
KSE100 75,457 Decreased By -60.8 (-0.08%)
KSE30 24,238 Decreased By -39.3 (-0.16%)

imageISLAMABAD: National Highway Authority (NHA) has invited Expression of lnterests (EO1s) from the construction firms to extend Islamabad-Murree Expressway (N-75) to Kohala and connect it with Muzaffarabad Expressway.

EOIs have been invited for conducting feasibility study and design of the subject project.The proposals are being evaluated and are in the process of finalization. Formalities associated with construction of the project will commence after completion of the feasibility study,said an official of the NHA Friday.

He said that the timeframe given for completion of feasibility study of the project and design is four months. Procurement process including tender with initiated soon after completion of feasibility study.

To a question,he said that the expected time by which the construction work on the said project will be initiated alongwith estimated cost will be ascertained after completion of feasibility and design of the project.

The Murree Expressway (N-75), also known as the Islamabad-Murree Expressway or the Islamabad-Murree-Muzaffarabad Expressway is a four-lane expressway connecting Islamabad to Murree.The Expressway passes through Barakahu, Murree, Phulgran, Upper Topa, Lower Topa, Bhurban, Aliyot and Phagwari before ending just outside Kohala.

Copyright APP (Associated Press of Pakistan), 2014

Comments

Comments are closed.