AIRLINK 80.60 Increased By ▲ 1.19 (1.5%)
BOP 5.26 Decreased By ▼ -0.07 (-1.31%)
CNERGY 4.52 Increased By ▲ 0.14 (3.2%)
DFML 34.50 Increased By ▲ 1.31 (3.95%)
DGKC 78.90 Increased By ▲ 2.03 (2.64%)
FCCL 20.85 Increased By ▲ 0.32 (1.56%)
FFBL 33.78 Increased By ▲ 2.38 (7.58%)
FFL 9.70 Decreased By ▼ -0.15 (-1.52%)
GGL 10.11 Decreased By ▼ -0.14 (-1.37%)
HBL 117.85 Decreased By ▼ -0.08 (-0.07%)
HUBC 137.80 Increased By ▲ 3.70 (2.76%)
HUMNL 7.05 Increased By ▲ 0.05 (0.71%)
KEL 4.59 Decreased By ▼ -0.08 (-1.71%)
KOSM 4.56 Decreased By ▼ -0.18 (-3.8%)
MLCF 37.80 Increased By ▲ 0.36 (0.96%)
OGDC 137.20 Increased By ▲ 0.50 (0.37%)
PAEL 22.80 Decreased By ▼ -0.35 (-1.51%)
PIAA 26.57 Increased By ▲ 0.02 (0.08%)
PIBTL 6.76 Decreased By ▼ -0.24 (-3.43%)
PPL 114.30 Increased By ▲ 0.55 (0.48%)
PRL 27.33 Decreased By ▼ -0.19 (-0.69%)
PTC 14.59 Decreased By ▼ -0.16 (-1.08%)
SEARL 57.00 Decreased By ▼ -0.20 (-0.35%)
SNGP 66.75 Decreased By ▼ -0.75 (-1.11%)
SSGC 11.00 Decreased By ▼ -0.09 (-0.81%)
TELE 9.11 Decreased By ▼ -0.12 (-1.3%)
TPLP 11.46 Decreased By ▼ -0.10 (-0.87%)
TRG 70.23 Decreased By ▼ -1.87 (-2.59%)
UNITY 25.20 Increased By ▲ 0.38 (1.53%)
WTL 1.33 Decreased By ▼ -0.07 (-5%)
BR100 7,629 Increased By 103 (1.37%)
BR30 24,842 Increased By 192.5 (0.78%)
KSE100 72,743 Increased By 771.4 (1.07%)
KSE30 24,034 Increased By 284.8 (1.2%)

ISLAMABAD: Prime Minister Shahid Khaqan Abbasi on Wednesday said as a result of the concerted efforts by present government, power situation had improved significantly saving people from the inconvenience of unscheduled and forced loadshedding.

The Prime Minister observed this while chairing a meeting of the Cabinet Committee on Energy here at the PM Office and reviewed power situation in the country.

Secretary Water and Power gave a detailed briefing on the current demand and supply situation in the power sector. He also presented projected figures for the power sector up to year 2023, according to a press release issued by the PM's Media Office here.

The Prime Minister reviewed various outstanding issues regarding the upcoming power plants and gave instructions for expeditious completion of ongoing power generation and transmission system in the country.

He was informed that 500 KV Neelum Jhelum transmission line would be completed by the end of this month. Transmission line of the same capacities in Port Qasim and Thar Matiari would be completed by October 2017 and June 2018 respectively.

It was informed that 220KV Jhampir-TM Road transmission line had been energized. Gharo Jhampir line of 220KV, 132 KV Patrind Mansehra and 500 KV Baloki transmission lines would be completed in the year 2018.

While reviewing the current distribution system, the Prime Minister advised the ministry of water and power to work out a comprehensive plan, in coordination with stakeholders, for reducing technical and commercial losses and making power distribution a viable sector.

 

 

Copyright APP (Associated Press of Pakistan), 2017
 

 

Comments

Comments are closed.