AIRLINK 69.92 Increased By ▲ 4.72 (7.24%)
BOP 5.43 Decreased By ▼ -0.14 (-2.51%)
CNERGY 4.48 Decreased By ▼ -0.08 (-1.75%)
DFML 25.71 Increased By ▲ 1.19 (4.85%)
DGKC 69.65 Decreased By ▼ -0.31 (-0.44%)
FCCL 20.05 Decreased By ▼ -0.25 (-1.23%)
FFBL 30.68 Increased By ▲ 1.57 (5.39%)
FFL 9.77 Decreased By ▼ -0.06 (-0.61%)
GGL 10.13 Increased By ▲ 0.12 (1.2%)
HBL 115.00 Increased By ▲ 0.75 (0.66%)
HUBC 132.70 Increased By ▲ 3.60 (2.79%)
HUMNL 6.70 Decreased By ▼ -0.01 (-0.15%)
KEL 4.38 Decreased By ▼ -0.06 (-1.35%)
KOSM 4.96 Increased By ▲ 0.07 (1.43%)
MLCF 36.46 Decreased By ▼ -0.54 (-1.46%)
OGDC 133.85 Increased By ▲ 1.55 (1.17%)
PAEL 22.55 Increased By ▲ 0.01 (0.04%)
PIAA 25.45 Decreased By ▼ -0.44 (-1.7%)
PIBTL 6.64 Increased By ▲ 0.04 (0.61%)
PPL 113.56 Increased By ▲ 0.71 (0.63%)
PRL 30.24 Increased By ▲ 0.83 (2.82%)
PTC 14.76 Decreased By ▼ -0.48 (-3.15%)
SEARL 57.65 Increased By ▲ 0.62 (1.09%)
SNGP 66.27 Decreased By ▼ -0.18 (-0.27%)
SSGC 10.95 Decreased By ▼ -0.03 (-0.27%)
TELE 8.82 Increased By ▲ 0.02 (0.23%)
TPLP 11.50 Decreased By ▼ -0.20 (-1.71%)
TRG 68.59 Decreased By ▼ -0.03 (-0.04%)
UNITY 23.50 Increased By ▲ 0.10 (0.43%)
WTL 1.34 Decreased By ▼ -0.04 (-2.9%)
BR100 7,394 Increased By 99.3 (1.36%)
BR30 24,113 Increased By 258.7 (1.08%)
KSE100 70,961 Increased By 670.6 (0.95%)
KSE30 23,389 Increased By 218.4 (0.94%)

ISLAMABAD: Prime Minister Shahid Khaqan Abbasi on Wednesday said as a result of the concerted efforts by present government, power situation had improved significantly saving people from the inconvenience of unscheduled and forced loadshedding.

The Prime Minister observed this while chairing a meeting of the Cabinet Committee on Energy here at the PM Office and reviewed power situation in the country.

Secretary Water and Power gave a detailed briefing on the current demand and supply situation in the power sector. He also presented projected figures for the power sector up to year 2023, according to a press release issued by the PM's Media Office here.

The Prime Minister reviewed various outstanding issues regarding the upcoming power plants and gave instructions for expeditious completion of ongoing power generation and transmission system in the country.

He was informed that 500 KV Neelum Jhelum transmission line would be completed by the end of this month. Transmission line of the same capacities in Port Qasim and Thar Matiari would be completed by October 2017 and June 2018 respectively.

It was informed that 220KV Jhampir-TM Road transmission line had been energized. Gharo Jhampir line of 220KV, 132 KV Patrind Mansehra and 500 KV Baloki transmission lines would be completed in the year 2018.

While reviewing the current distribution system, the Prime Minister advised the ministry of water and power to work out a comprehensive plan, in coordination with stakeholders, for reducing technical and commercial losses and making power distribution a viable sector.

 

 

Copyright APP (Associated Press of Pakistan), 2017
 

 

Comments

Comments are closed.