AIRLINK 79.41 Increased By ▲ 1.02 (1.3%)
BOP 5.33 Decreased By ▼ -0.01 (-0.19%)
CNERGY 4.38 Increased By ▲ 0.05 (1.15%)
DFML 33.19 Increased By ▲ 2.32 (7.52%)
DGKC 76.87 Decreased By ▼ -1.64 (-2.09%)
FCCL 20.53 Decreased By ▼ -0.05 (-0.24%)
FFBL 31.40 Decreased By ▼ -0.90 (-2.79%)
FFL 9.85 Decreased By ▼ -0.37 (-3.62%)
GGL 10.25 Decreased By ▼ -0.04 (-0.39%)
HBL 117.93 Decreased By ▼ -0.57 (-0.48%)
HUBC 134.10 Decreased By ▼ -1.00 (-0.74%)
HUMNL 7.00 Increased By ▲ 0.13 (1.89%)
KEL 4.67 Increased By ▲ 0.50 (11.99%)
KOSM 4.74 Increased By ▲ 0.01 (0.21%)
MLCF 37.44 Decreased By ▼ -1.23 (-3.18%)
OGDC 136.70 Increased By ▲ 1.85 (1.37%)
PAEL 23.15 Decreased By ▼ -0.25 (-1.07%)
PIAA 26.55 Decreased By ▼ -0.09 (-0.34%)
PIBTL 7.00 Decreased By ▼ -0.02 (-0.28%)
PPL 113.75 Increased By ▲ 0.30 (0.26%)
PRL 27.52 Decreased By ▼ -0.21 (-0.76%)
PTC 14.75 Increased By ▲ 0.15 (1.03%)
SEARL 57.20 Increased By ▲ 0.70 (1.24%)
SNGP 67.50 Increased By ▲ 1.20 (1.81%)
SSGC 11.09 Increased By ▲ 0.15 (1.37%)
TELE 9.23 Increased By ▲ 0.08 (0.87%)
TPLP 11.56 Decreased By ▼ -0.11 (-0.94%)
TRG 72.10 Increased By ▲ 0.67 (0.94%)
UNITY 24.82 Increased By ▲ 0.31 (1.26%)
WTL 1.40 Increased By ▲ 0.07 (5.26%)
BR100 7,526 Increased By 32.9 (0.44%)
BR30 24,650 Increased By 91.4 (0.37%)
KSE100 71,971 Decreased By -80.5 (-0.11%)
KSE30 23,749 Decreased By -58.8 (-0.25%)

bilour 400ISLAMABAD: Minister for Railway Haji Ghulam Ahmed Bilour Friday demanded of the federal government to enhance the electricity supply to Khyber Pukhtunkhwa from current 1300 megawatts to 2200 MW to cope with province's power needs.

In this regard, the railways minister called on Minister for Water and Power Chaudhry Ahmed Mukhtar and conveyed people's sentiments on the situation created out of the prolonged power outages.

He said KP province produces around 3200 MW of electricity but it receives only 1300MW- even far lesser than one-third of the province's contribution of electricity to national grid.

He said despite government's announcement of no load-shedding during Sehr, Iftar and Tarawih timings, the situation gives a contrary picture.

Bilour said though KP province needs to be supplied the whole produce of electricity, the people of province are ready to sacrifice their share for their brethren of other provinces.

"But at least our people should be supplied one-third of total production that is 2200MW," Bilour demanded.

He said the price of the electricity produced in KP is cheaper than that of other provinces, but people of the province were suffering owing to load-shedding.

In response, Ahmed Mukhtar said he has summoned a meeting to be attended by chairmen of all power distribution companies, hoping that the situation would be resolved within days.

The water and power minister said the government would try its utmost to provide maximum relief to people through efficient power management.

Bilour said he had also called on President Asif Zardrai and had raised the very issue of prolonged load-shedding before him.

He quoted the President saying that he was cognizant of the situation and would take steps to control it without any delay.

Copyright APP (Associated Press of Pakistan), 2012

Comments

Comments are closed.