AIRLINK 80.25 Increased By ▲ 0.84 (1.06%)
BOP 5.29 Decreased By ▼ -0.04 (-0.75%)
CNERGY 4.37 Decreased By ▼ -0.01 (-0.23%)
DFML 35.09 Increased By ▲ 1.90 (5.72%)
DGKC 76.73 Decreased By ▼ -0.14 (-0.18%)
FCCL 20.60 Increased By ▲ 0.07 (0.34%)
FFBL 31.80 Increased By ▲ 0.40 (1.27%)
FFL 9.76 Decreased By ▼ -0.09 (-0.91%)
GGL 10.20 Decreased By ▼ -0.05 (-0.49%)
HBL 117.44 Decreased By ▼ -0.49 (-0.42%)
HUBC 134.52 Increased By ▲ 0.42 (0.31%)
HUMNL 7.03 Increased By ▲ 0.03 (0.43%)
KEL 4.56 Decreased By ▼ -0.11 (-2.36%)
KOSM 4.70 Decreased By ▼ -0.04 (-0.84%)
MLCF 37.40 Decreased By ▼ -0.04 (-0.11%)
OGDC 136.32 Decreased By ▼ -0.38 (-0.28%)
PAEL 23.15 No Change ▼ 0.00 (0%)
PIAA 27.06 Increased By ▲ 0.51 (1.92%)
PIBTL 6.99 Decreased By ▼ -0.01 (-0.14%)
PPL 113.60 Decreased By ▼ -0.15 (-0.13%)
PRL 27.37 Decreased By ▼ -0.15 (-0.55%)
PTC 14.81 Increased By ▲ 0.06 (0.41%)
SEARL 57.20 No Change ▼ 0.00 (0%)
SNGP 67.00 Decreased By ▼ -0.50 (-0.74%)
SSGC 11.01 Decreased By ▼ -0.08 (-0.72%)
TELE 9.35 Increased By ▲ 0.12 (1.3%)
TPLP 11.56 No Change ▼ 0.00 (0%)
TRG 72.20 Increased By ▲ 0.10 (0.14%)
UNITY 25.65 Increased By ▲ 0.83 (3.34%)
WTL 1.39 Decreased By ▼ -0.01 (-0.71%)
BR100 7,551 Increased By 25.2 (0.33%)
BR30 24,658 Increased By 8.8 (0.04%)
KSE100 72,073 Increased By 101.6 (0.14%)
KSE30 23,788 Increased By 39.4 (0.17%)

imageISLAMABAD: Pakistan Railways is upgrading signalling system at 23 stations, out of which 14 have so far been refurbished under a rehabilitation project.

"The project is part of Rehabilitation of assets damaged during riots on December 27-28, 2007, following the death of PPP Chairperson Shaheed Mohtarma Benazir Bhutto," an official in the Ministry of Railways told APP.

He said that another signalling project titled "Replacement of Old and Obsolete Signalling Gear Lodhran-Shahdara Section" is in the progress for installation of modern Auto Block Signalling System at a cost of Rs 1,500 million.

Answering a question, the official informed that 90 kilometres out of 433 kilometers Auto Block Signalling system and two stations out of 31 stations are opened for traffic after installation, testing and commissioning of modern computer based interlocking (CBI) system, he added.

The official said that 86kms Auto Block Signalling System and four more stations have been opened for traffic under CBI system during the financial year 2016.

The government is taking new initiatives to improve performance of Pakistan Railways and achieve tangible results included improve availability of locomotives through special repair of existing locomotives and procurement of new locomotives, he added.

Copyright APP (Associated Press of Pakistan), 2016

Comments

Comments are closed.