AIRLINK 72.80 Decreased By ▼ -1.30 (-1.75%)
BOP 5.04 Increased By ▲ 0.04 (0.8%)
CNERGY 4.45 Increased By ▲ 0.11 (2.53%)
DFML 29.75 Increased By ▲ 0.21 (0.71%)
DGKC 84.60 Increased By ▲ 1.05 (1.26%)
FCCL 22.35 Decreased By ▼ -0.08 (-0.36%)
FFBL 34.40 Decreased By ▼ -0.50 (-1.43%)
FFL 10.22 Increased By ▲ 0.35 (3.55%)
GGL 10.31 Increased By ▲ 0.31 (3.1%)
HBL 113.00 Increased By ▲ 1.00 (0.89%)
HUBC 141.35 Increased By ▲ 3.66 (2.66%)
HUMNL 8.03 Increased By ▲ 1.05 (15.04%)
KEL 4.46 Increased By ▲ 0.06 (1.36%)
KOSM 4.55 Decreased By ▼ -0.04 (-0.87%)
MLCF 38.70 Increased By ▲ 0.15 (0.39%)
OGDC 134.85 Decreased By ▼ -1.75 (-1.28%)
PAEL 26.63 Increased By ▲ 1.49 (5.93%)
PIAA 26.10 Decreased By ▼ -0.41 (-1.55%)
PIBTL 6.60 Decreased By ▼ -0.05 (-0.75%)
PPL 122.50 Decreased By ▼ -2.90 (-2.31%)
PRL 28.35 Increased By ▲ 0.14 (0.5%)
PTC 14.00 Decreased By ▼ -0.30 (-2.1%)
SEARL 54.80 Increased By ▲ 0.20 (0.37%)
SNGP 70.51 Decreased By ▼ -0.69 (-0.97%)
SSGC 10.45 Decreased By ▼ -0.05 (-0.48%)
TELE 8.62 Increased By ▲ 0.10 (1.17%)
TPLP 11.00 Increased By ▲ 0.06 (0.55%)
TRG 61.52 Increased By ▲ 0.82 (1.35%)
UNITY 25.23 Decreased By ▼ -0.10 (-0.39%)
WTL 1.30 Increased By ▲ 0.04 (3.17%)
BR100 7,666 Increased By 1.3 (0.02%)
BR30 25,129 Increased By 103.3 (0.41%)
KSE100 73,134 Increased By 369.5 (0.51%)
KSE30 23,748 Decreased By -27.7 (-0.12%)

ISLAMABAD: Prime Minister Shahid Khaqan Abbasi on Wednesday said as a result of the concerted efforts by present government, power situation had improved significantly saving people from the inconvenience of unscheduled and forced loadshedding.

The Prime Minister observed this while chairing a meeting of the Cabinet Committee on Energy here at the PM Office and reviewed power situation in the country.

Secretary Water and Power gave a detailed briefing on the current demand and supply situation in the power sector. He also presented projected figures for the power sector up to year 2023, according to a press release issued by the PM's Media Office here.

The Prime Minister reviewed various outstanding issues regarding the upcoming power plants and gave instructions for expeditious completion of ongoing power generation and transmission system in the country.

He was informed that 500 KV Neelum Jhelum transmission line would be completed by the end of this month. Transmission line of the same capacities in Port Qasim and Thar Matiari would be completed by October 2017 and June 2018 respectively.

It was informed that 220KV Jhampir-TM Road transmission line had been energized. Gharo Jhampir line of 220KV, 132 KV Patrind Mansehra and 500 KV Baloki transmission lines would be completed in the year 2018.

While reviewing the current distribution system, the Prime Minister advised the ministry of water and power to work out a comprehensive plan, in coordination with stakeholders, for reducing technical and commercial losses and making power distribution a viable sector.

 

 

Copyright APP (Associated Press of Pakistan), 2017
 

 

Comments

Comments are closed.